Laserfiche WebLink
Document ID <br />Document Title Latest Revisions Description <br />Latest Revision Issue <br />Date <br />mom. <br />C0.20 <br />DEMOLITION PLAN <br />Bid Package #2 <br />09.29.17 <br />x <br />x <br />C0.30 <br />EROSION CONTROL PLAN <br />Bid Package #2 <br />09.29.17 <br />X <br />x <br />C0.40 <br />SWMP AND EROSION CONTROL DETAIL <br />Bid Package #2 <br />09.29.17 <br />X <br />X <br />C0.50 <br />EROSION CONTROL DETAILS <br />Bid Package #2 <br />09.29.17 <br />X <br />X <br />C0.60 <br />EROSION CONTROL DETAILS <br />Bid Package #2 <br />09.29.17 <br />X <br />C1.00 <br />GRADING AND DRAINAGE PLAN <br />Bid Package #2 <br />09.29.17 <br />X <br />X <br />C1.10 <br />DETAILED GRADING AND DRAINAGE PLAN <br />Bid Package #2 <br />09.29.17 <br />X <br />X <br />C1.20 <br />DETAILED GRADING AND DRAINAGE PLAN <br />Bid Package #2 <br />09.29.17 <br />X <br />C2.00 <br />OVERALL UTILITY PLAN <br />Bid Package #2 <br />09.29.17 <br />X <br />X <br />C2.10 <br />UTILITY PLAN DETAILS <br />Bid Package #2 <br />09.29.17 <br />X <br />X <br />C3.00 <br />HORIZONTAL CONTROL PLAN <br />Bid Package #2 <br />09.29.17 <br />X <br />X <br />C3.10 <br />HORIZONTAL CONTROL PLAN <br />Bid Package #2 <br />09.29.17 <br />X <br />X <br />C3.20 <br />SITE DETAILS <br />Bid Package #1 <br />07.28.17 <br />X <br />LANDSCAPE <br />L1.0 <br />LANDSCAPE PLAN - OVERALL <br />Bid Package #2 <br />09.29.17 <br />X <br />X <br />L1.1 <br />PLANTING PLAN <br />Bid Package #2 <br />09.29.17 <br />X <br />X <br />L4.0 <br />LANDSCAPE DETAILS <br />Bid Package #2 <br />09.29.17 <br />X <br />X <br />L4.1 <br />LANDSCAPE DETAILS <br />Bid Package #2 <br />09.29.17 <br />X <br />X <br />L4.2 <br />LANDSCAPE DETAILS <br />Bid Package #2 <br />09.29.17 <br />X <br />IRRIGATION <br />11.0 <br />12.0 <br />IRRIGATION PLAN <br />IRRIGATION DETAILS <br />Bid Package #2 <br />Bid Package #2 <br />ARCHITECTURAL DEMO <br />AD2.10 <br />MAIN LEVEL FLOOR PLAN - OVERALL - DEMO <br />BP2 -Addendum 1 <br />09.29.17 <br />09.29.17 <br />X <br />X <br />X <br />X <br />10.13.17 <br />X <br />X <br />X <br />ARCHITECTURAL <br />A1.20 <br />SITE DETAILS <br />Bid Package #2 <br />09.29.17 <br />X <br />A2.10 <br />GROUND LEVEL FLOOR PLAN - OVERALL <br />BP2 -Addendum 1 <br />10.13.17 <br />X <br />X <br />X <br />A2.20 <br />FLOOR PLAN - ENLARGED <br />BP2 -Addendum 1 <br />10.13.17 <br />X <br />x <br />X <br />A2.30 <br />ROOF PLANS <br />BP2 -Addendum 1 <br />10.13.17 <br />X <br />X <br />A2.51 <br />SLAB DRAINAGE PLAN <br />BP2 -Addendum 1 <br />10.13.17 <br />X <br />X <br />A3.10 <br />EXTERIOR ELEVATIONS - OVERALL <br />BP2 -Addendum 1 <br />10.13.17 <br />X <br />X <br />X <br />A3.20 <br />EXTERIOR ELEVATIONS - ENLARGED <br />BP2 -Addendum 1 <br />10.13.17 <br />X <br />X <br />X <br />A3.21 <br />EXTERIOR ELEVATIONS -ENLARGED <br />BP2 -Addendum 1 <br />10.13.17 <br />X <br />X <br />X <br />A3.30 <br />BUILDING SECTIONS - POOLHOUSE <br />BP2 -Addendum 1 <br />10.13.17 <br />X <br />X <br />A3.31 <br />BUILDING SECTIONS - STORAGE <br />BP2 -Addendum 1 <br />10.13.17 <br />X <br />X <br />X <br />A3.40 <br />WALL SECTIONS <br />BP2 -Addendum 1 <br />10.13.17 <br />X <br />X <br />A3.41 <br />WALL SECTIONS <br />BP2 -Addendum 1 <br />10.13.17 <br />X <br />A5.00 <br />TOILET ACCESSORIES AND MISC. EQUIPMENT <br />Bid Package #2 <br />09.29.17 <br />X <br />X <br />A5.10 <br />INTERIOR ELEVATIONS <br />BP2 -Addendum 1 <br />10.13.17 <br />X <br />X <br />X <br />A5.11 <br />INTERIOR ELEVATIONS <br />Bid Package #2 <br />09.29.17 <br />X <br />X <br />A5.70 <br />STANDARD MILLWORK DETAILS <br />Bid Package #2 <br />09.29.17 <br />X <br />X <br />A6.10 <br />REFLECTED CEILING PLAN <br />BP2 -Addendum 1 <br />10.13.17 <br />X <br />X <br />X <br />Document Control Log <br />Pag46f 8 <br />Print Date: 11/7/2017 <br />