My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
City Council Agenda and Packet 2017 12 05
PORTAL
>
CITY COUNCIL RECORDS
>
AGENDAS & PACKETS (45.010)
>
2010-2019 City Council Agendas and Packets
>
2017 City Council Agendas and Packets
>
City Council Agenda and Packet 2017 12 05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 2:12:27 PM
Creation date
12/14/2017 1:29:45 PM
Metadata
Fields
Template:
City Council Records
Doc Type
City Council Packet
Original Hardcopy Storage
7B5
Supplemental fields
Test
CCAGPKT 2017 12 05
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
210
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
WORK CHANGE DIRECTIVE INSTRUCTIONS <br />A. GENERAL INFORMATION <br />This document was developed for use in situations involving changes in the Work that, if not <br />processed expeditiously, might delay the Project. These changes are often initiated in the <br />field and may affect the Contract Price or the Contract Times. This is not a Change Order, <br />but only a directive to proceed with Work that may be included in a subsequent Change <br />Order. <br />For supplemental instructions and minor changes not involving a possible change in the <br />Contract Price or the contract Times a Field Order may be used. <br />B. COMPLETING THE WORK CHANGE DIRECTIVE FORM <br />Engineer initiates the form, including a description of the items involved and attachments. <br />Based on conversations between Engineer and Contractor, Engineer completes the <br />following: <br />METHOD OF DETERMINING CHANGE, IF ANY, IN CONTRACT PRICE. Mark the method <br />to be used in determining the final cost of Work involved and the estimated net effect on the <br />Contract Price. If the change involves an increase in the Contract Price and the estimated <br />amount is approached before the additional or changed Work is completed, another Work <br />Change Directive must be issued to change the estimated price or Contractor may stop the <br />changed Work when the estimated price is reached. If the Work Change Directive is not <br />likely to change the Contract Price, the space for estimated increase (decrease) should be <br />marked "Not Applicable. <br />METHOD OF DETERMINING CHANGE, IF ANY, IN CONTRACT TIMES: Mark the method <br />to be used in determining the change in Contract Times and the estimated increase or <br />decease in Contract Times. If the change involves an increase in the Contract Times and <br />the estimated times are approached before the additional or changed Work is completed, <br />another Work Change Directive must be issued to change the times or Contractor may stop <br />the changed Work when the estimated times are reached. If the Work Change Directive is <br />not likely to change the Contract Times, the space for estimated increase (decrease) should <br />be marked "Not Applicable". <br />Once authorized by Engineer a copy will be sent to Contractor. Price and Times may only <br />be changed by Change Order signed by Owner and Contractor. <br />Once the Work covered by this directive is completed or final cost and times are <br />determined, Contractor should submit documentation for inclusion in a Change Order. <br />THIS IS A DIRECTIVE TO PROCEED WITH A CHANGE THAT MAY AFFECT THE <br />CONTRACT PRICE OR THE CONTRACT TIMES. A CHANGE ORDER, IF ANY, SHOULD <br />BE CONSIDERED PROMPTLY. <br />CITY OF LOUISVILLE <br />HVAC IMPROVEMENTS FOR HBWTP <br />27 <br />00 52 00 - 15 <br />AGREEMENT <br />