My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
City Council Agenda and Packet 2017 12 05
PORTAL
>
CITY COUNCIL RECORDS
>
AGENDAS & PACKETS (45.010)
>
2010-2019 City Council Agendas and Packets
>
2017 City Council Agendas and Packets
>
City Council Agenda and Packet 2017 12 05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 2:12:27 PM
Creation date
12/14/2017 1:29:45 PM
Metadata
Fields
Template:
City Council Records
Doc Type
City Council Packet
Original Hardcopy Storage
7B5
Supplemental fields
Test
CCAGPKT 2017 12 05
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
210
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CERTIFICATE OF SUBSTANTIAL COMPLETION <br />TO: <br />PROJECT: SID COPELAND WATER TREATMENT PLANT HIGH ZONE / MID ZONE PUMP STATION <br />OWNERS PROJECT NUMBER: 051-499-55450-38 <br />OWNER: CITY OF LOUISVILLE, COLORADO <br />This Certificate of Substantial Completion applies to all Work under the Contract Documents or to <br />the following specified parts thereof: <br />The Work to which this Certificate applies has been inspected by authorized representatives of <br />OWNER, and that Work is hereby declared to be substantially complete in accordance with the <br />Contract Documents on <br />DATE OF SUBSTANTIAL COMPLETION <br />A tentative list of items to be completed or corrected is attached hereto. This list may not be all- <br />inclusive, and the failure to include an item in the list does not alter the responsibility of <br />CONTRACTOR to complete all the Work in accordance with the Contract Documents. The items in <br />the tentative list shall be completed or corrected by CONTRACTOR within twenty (20) days of the <br />issuance of this Certificate of Substantial Completion. <br />CONTRACTOR shall maintain all contractual responsibilities until Final Acceptance. <br />The following documents are attached to and made a part of this Certificate of Substantial <br />Completion: <br />Attachments: <br />(For items to be attached see definition of Substantial Completion as supplemented and other <br />specifically noted conditions precedent to achieving Substantial Completion as required by the <br />Contract Documents.) <br />CITY OF LOUISVILLE <br />HVAC IMPROVEMENTS FOR HBWTP <br />32 <br />00 52 00 - 20 <br />AGREEMENT <br />
The URL can be used to link to this page
Your browser does not support the video tag.