My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
City Council Agenda and Packet 2017 11 28
PORTAL
>
CITY COUNCIL RECORDS
>
AGENDAS & PACKETS (45.010)
>
2010-2019 City Council Agendas and Packets
>
2017 City Council Agendas and Packets
>
City Council Agenda and Packet 2017 11 28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 2:12:27 PM
Creation date
12/14/2017 1:49:49 PM
Metadata
Fields
Template:
City Council Records
Doc Type
City Council Packet
Original Hardcopy Storage
7B5
Supplemental fields
Test
CCAGPKT 2017 11 28
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
282
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City Council <br />Meeting Minutes <br />November 16, 2017 <br />Page 3 of 4 <br />Councilmember Loo asked staff why in the amended document it removes the item <br />related to City tree damage penalties. <br />Greg Colwell, preconstruction manager, Saunders Construction, stated that was <br />duplicate language from the first contract so it was not needed here. <br />Councilmember Maloney clarified that the next contract will be on December 19 and it <br />will combine what were expected to be amendments 3 and 4. Interim City Manager <br />Balser confirmed that. <br />Attorney Light stated Council may want to include in the action tonight the option of <br />allowing the Mayor and City Manager be authorized to sign any non -substantive <br />changes to the contract if needed. <br />Councilmember Stolzmann asked if there is an estimate on the payback for a new <br />filtration system. Stevens stated there is no life cycle estimate on that yet but staff will <br />get that for the December 19 meeting. <br />Councilmember Stolzmann asked what changes are being considered for the lazy river. <br />Director Stevens stated the jets used could be stronger to give a faster current if we can <br />afford it. <br />Councilmember Stolzmann asked about the steam sauna renovation and asked what it <br />addresses. Superintendent Martin stated racquet ball court #2 shares a common wall <br />with the steam room. The public had requested some noise mitigation for that wall. <br />However, that area is not be touched with the renovation so it will not be addressed. If <br />we are to expand this area the noise issue will be addressed. <br />Councilmember Stolzmann asked if an additional $300,000 will be needed on top of the <br />$250,000 requested this evening. Director Stevens stated that additional cost is not <br />anticipated; staff is not contemplating anything beyond the $250,000. <br />Director Stevens noted until the project gets out of the ground there are still some <br />wildcard costs that could arise. Also, once the city starts demolition at Memory Square <br />the City could run into some unknown issues. At this time, staff thinks the city can <br />handle all of these costs with the additional $250,000. <br />Director Stevens stated the City is still working on value engineering and other cost <br />savings. There is some flexibility in the interior finishes and he thinks the City will come <br />in within the budget. <br />Councilmember Maloney stated we don't have a lot of control over these increased <br />costs. We need to value engineer what we can. He stated he doesn't want to cut <br />anything out of the building that the public is expecting but also not harm our operations <br />or cut additional CIP projects to pay for this. There should be no question we are going <br />50 <br />
The URL can be used to link to this page
Your browser does not support the video tag.