Laserfiche WebLink
5 Year Utility Background <br />Strategic Planning Efforts <br />Natural Disaster Mitigation <br />Compliance/Failure Efforts <br />Drought Management <br />WTP Facilities Plan <br />Water/ Sewer Replacement <br />Flood Debris Removal <br />WW Rate Structure Change <br />Stormwater Master Plan <br />Water/ Sewer Replacement <br />Raw Water Master Plan <br />Superior Interconnect <br />WWTP Construction <br />Downtown Floodplain <br />Construction <br />SCADA MasterPlan <br />SCWTP Clearwell <br />Staff Rate Modeling <br />Street Booster Water/ Sewer <br />Utility Rate Study <br />Utility Rate Task Force <br />Utility Rate Model <br />Drought Management <br />WWTP Facilities Plan <br />Flood - Intake, HBWTP, Louisville Pipeline <br />MultiFamily, Irrigation Tap Fee Revisions <br />3 LZ MG Tank Rehabilitation <br />Harney Lastoka Pipeline <br />Water/ Sewer Replacement <br />4 <br />WWTP & Stormwater Bonds Issued <br />Water Efficiency Plan <br />WWTP Construction <br />Downtown Floodplain <br />Construction <br />Superior Integration Study <br />HBWTP Solids Drying Beds <br />Intake Reconstruction <br />Water/ Sewer Replacement <br />