Laserfiche WebLink
NORTHWEST TRANSPORTATION NETWORK - DRAFT PROJECT LIST <br />Project <br />Description/Boundaries <br />Startup/Construction <br />Costs (Planning & Capital) Annual O&M Costs <br />10 Year Operating Cost <br />(assume 5% annual Total Cost (capital + 10 Partial Funding <br />Increase) year operating) Commitment <br />Other Potential <br />Funding Partners <br />Source <br />NAMS CORRIDORS <br />SH119 BRT/Managed Lane <br />SH119 BRT/Managed Lane <br />Downtown Boulder to Downtown Longmont inc BRT, first and final mile connections, and other multimodal <br />corridor improvements to support BRT. <br />69,526,962 <br />$ 7,840,020 <br />$ 98,610,924 <br />$ 168,137,886 <br />RTD: $30m CDOT <br />$50m <br />RTD/CDOT/DRCOG <br />RTD NAMS Study+5%ann inc. <br />SH119 Bikeway <br />Boulder (47th Street) to Longmont (Hover) -Full Build Out/ w grade separations <br />$ 24,000,000 <br />N/A <br />N/A <br />$ 24,000,000 <br />RTD/CDOT/DRCOG <br />Boulder County <br />Ken Pratt (SH -119) Roadway & BRT improvements; <br />SH 7 PEL BRT/Managed Lane <br />Ken Pratt (SH -119) between Nelson Rd and S. Pratt Pkwy <br />3,500,000 <br />TOTAL <br />$ 97,026,962 <br />$ 7,840,020 <br />$ 98,610,924 <br />$ 192,137,886 <br />RTD/CDOT/DRCOG <br />City of Longmont <br />SH7 BRT NEPA study <br />Boulder to Brighton <br />2,000,000 <br />N/A <br />N/A <br />$ 2,000,000 <br />RTD/CDOT/DRCOG <br />Boulder County <br />SH 7 BRT Implementation (from PEL study) <br />SH7/US287 intersection Improvements <br />Downtown Boulder to Downtown Brighton inc BRT, first and final mile connections, and other multimodal <br />improvements to support BRT. <br />SH7 & US287 ( East past 9 mile, west to Silo Intersection on Arapahoe) <br />$ 350,000,000 <br />incl. above <br />$ 4,606,773 <br />N/A <br />$ 57,943,496 <br />$ 407,943,496 <br />RTD/CDOT/DRCOG <br />N/A <br />incl. above <br />CDOT/DRCOG <br />2017 Boulder County BRT & <br />PEL, COB EEA studies <br />Boulder County <br />SH7/95th St Intersection improvements <br />SH7 & 95th St <br />incl. above <br />N/A <br />N/A <br />incl. above <br />CDOT/DRCOG <br />Boulder County <br />SBR/120th reconstruction/Intersection Imp. per SH7 PEL <br />Imp./Recon. within City of Lafayette <br />incl. above <br />N/A <br />N/A <br />incl. above <br />DRCOG, BoCo ST, <br />and Laf. <br />CDOT/DRCOG <br />City of Lafayette <br />SH7/119th/120th Street Int. Improvements <br />SH7 (Baseline Road) and 119th Street <br />incl. above <br />N/A <br />N/A <br />incl. above <br />Laf. Partial funding <br />CDOT/DRCOG <br />City of Lafayette <br />E. Emma & 120th Int. <br />Intersection Reconstruction <br />incl. above <br />N/A <br />N/A <br />incl. above <br />Laf. And BoCo ST <br />CDOT/DRCOG <br />Boulder County <br />SH7 Bikeway <br />Boulder to Erie <br />incl. above <br />N/A <br />N/A <br />incl. above <br />CDOT/DRCOG <br />Boulder County <br />TOTAL <br />$ 352,000,000 <br />$ 4,606,773 <br />$ 57,943,496 <br />$ 409,943,496 <br />SH287 BRT <br />US287 BRT Feasability & NEPA study <br />Longmont to Denver <br />3,500,000 <br />N/A <br />N/A <br />$ 3,500,000 <br />RTD/CDOT/DRCOG <br />Boulder County <br />Longmont -Broomfield multi -use path/bikeway <br />Longmont to Broomfield <br />$ 18,000,000 <br />N/A <br />N/A <br />$ 18,000,000 <br />CDOT/DRCOG <br />Boulder County <br />SH287 BRT <br />BRT service - Longmont, Lafayette, Broomfield, <br />68,554,557 $ 8,824,580 <br />$ 110,994,615 <br />$ 179,549,172 <br />RTD/CDOT/DRCOG <br />RTD NAMS Study+5%ann inc. <br />Remaining US36 <br />TOTAL <br />90,054,557 $ 8,824,580 <br />$ 110,994,615 <br />$ 201,049,172 <br />US36 BRT Completion <br />US36 BRT Completion <br />Remaining capital improvements and service expansion for Flatiron Flyer. Broomfield N side P -n -R, <br />$ 36,465,192 <br />N/A <br />N/A <br />$ 36,465,192 <br />RTD/CDOT/DRCOG <br />RTD NAMS Study+5%ann inc. <br />Westminster Station ped bridge, relocation of Church Ranch platform. Does not include funding for add'I <br />vehicles. <br />US 36 Bikeway Underpasses at Sheridan and Church Ranch <br />Constructs remaining grade separations of US 36 Bikeway <br />$ 5,400,000 <br />N/A <br />N/A <br />$ 5,000,000 <br />RTD/CDOT/DRCOG <br />City of Westminster <br />US 36 Bikeway Improvements <br />Flatiron Crossing Underpass to Flatiron Marketplace <br />$ 5,000,000 <br />N/A <br />N/A <br />$ 5,000,000 <br />RTD/CDOT/DRCOG <br />City/County of Broomfield <br />Table Mesa Underpass/Bridge Widening <br />Improved Access (first/final mile) from US -36 Bikeway to Table Mesa Park n Ride and Foothills Multi -Use Path <br />$ 6,000,000 <br />N/A <br />N/A <br />$ 6,000,000 <br />RTD/CDOT/DRCOG <br />City of Boulder <br />TOTAL <br />52,865,192 <br />52,465,192 <br />NAMS Corridor Entrance to Boulder <br />Boulder BRT Improvements 28th, Broadway & Table Mesa <br />Transit operational improvements along Broadway and 28th Streets in Boulder to benefit multiple regional BRT <br />routes (Flatiron Flyer, SH119, SH7, South Boulder Road) <br />5,955,985 <br />$ 3,524,972 <br />- $ 5,955,985 <br />RTD/CDOT/DRCOG <br />RTD NAMS Study+5%ann inc. <br />Canyon Boulevard Complete Street Corridor <br />Transforming Canyon Boulevard Corridor to Complete Street in Central Core of Boulder <br />$ 20,000,000 <br />TOTAL <br />$ 25,955,985 <br />N/A <br />$ 3,524,972 <br />N/A $ 20,000,000 <br />- $ 25,955,985 <br />RTD/CDOT/DRCOG <br />City of Boulder <br />NW Rail <br />Quiet Zone Corridor Completion <br />Implement Quiet Zone Corridor through 20 -Mile NAMS Corridor <br />$ 11,200,000 <br />N/A <br />N/A <br />$ 11,200,000 <br />DRCOG+Local <br />Comm. <br />DRCOG/RTD <br />2017 TIGER app cost est. <br />NWR Peak Hour Service <br />Peak Hour only service <br />$ 108,000,000 <br />$ 14,000,000 <br />$ 176,090,495 $ 284,090,495 <br />RTD <br />2017 Startup analysis w/ <br />RTD/Costs does not include <br />BNSF Charges <br />NWR- Westminster Extension <br />Westminster Station to Downtown Westminster <br />$ 303,876,567 <br />$ <br />303,876,567 <br />NAMS PHASE 1 TOTAL <br />$ 423,076,567 <br />$ 14,000,000 <br />$ 176,090,495 $ 599,167,062 <br />7 <br />RTD <br />RTD NAMS Study+5%ann inc. <br />