Laserfiche WebLink
EIAF #8550 — Louisville MAC Gym Expansion <br />EXHIBIT B — SCOPE OF PROJECT (SOP) <br />1. PURPOSE <br />1.1. Energy Impact The purpose of the Energy and Mineral Impact Assistance Program is to assist <br />political subdivisions that are socially and/or economically impacted by the development, processing, <br />or energy conversion of minerals and mineral fuels <br />2. DESCRIPTION OF THE PROJECT(S) AND WORK <br />2.1. Project Description The Project consists of the construction of a Multi -Activity Court (MAC) <br />gymnasium attached to the Louisville Recreation/Senior Center (LRSC) in Louisville, Colorado <br />2.2. Work Description The City of Louisville (Grantee) shall construct an expansion of the Louisville <br />Recreation/Senior Center (LRSC) by adding an approximately 8,600 square foot Multi -Activity Court <br />(MAC) gymnasium to the existing facility The MAC addition will be constructed adjacent and <br />connected to the LRSC The MAC shall include a synthetic multi -use floor. The grantee shall own and <br />maintain all aspects of the facility and, in accordance with §9 below, a contractor will be hired to <br />complete the Work <br />2.3. Responsibilities Grantee shall be responsible for the completion of the Work and to provide required <br />documentation to DOLA as specified herein <br />2.3.1. Grantee shall notify DOLA at least 30 days in advance of Project Completion. <br />2.4. Recapture of Advanced Funds To maximize the use of Grant Funds, the State shall evaluate <br />Grantee's expenditure of the Grant Funds for timeliness and compliance with the terms of this Grant <br />DOLA reserves the right to recapture advanced Grant Funds when Grantee has not or is not complying <br />with the terms of this Grant <br />2.5. Eligible Expenses Eligible expenses shall include those costs incurred in constructing the addition of <br />the Multi -Activity Court (MAC) gymnasium to the existing Louisville Recreation/Senior Center <br />(LRSC). These expenses may include materials, labor, built in project elements and required testing <br />Engineering, legal fees/permitting, construction management and furnishings shall be the sole <br />responsibility of the Grantee. <br />3. DEFINITIONS <br />3.1. "Cumulative Budgetary Line Item Changes" means a cumulative or increasing accumulation of <br />additional expenses within a specific line item as listed in §6.2 Budget within this Exhibit B <br />3.2. Project Budget Line Items <br />3.2.1. "Building or Facility Construction" means labor and materials costs, bond and insurance costs, <br />bid advertisements, purchase and erection of pre-engineered buildings, and attorney's fees <br />3.3. "Substantial Completion" means the Work is sufficiently complete in accordance with the Grant so it <br />can be utilized for its intended purpose without undue interference <br />4. DELIVERABLES <br />4.1. Outcome. The final outcome of this Grant is the City of Louisville will have a newly renovated <br />recreation and community center that will serve the population for years to come. <br />4.2. Service Area. The performance of the Work described within this Grant shall be located in the City of <br />Louisville, Colorado <br />4.3. Performance Measures. Grantee shall comply with the following performance measures: <br />Milestone/Performance Measure/Grantee will: <br />Bim". <br />Put Project out to bid <br />Within 30 days after the <br />Effective Date of this <br />Grant Agreement <br />Provide DOLA with bid tabulation <br />Within 7 days after the <br />Page 1 of 5 <br />