My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Building Code Board of Appeals Agenda and Packet 2018 02 15
PORTAL
>
BOARDS COMMISSIONS COMMITTEES RECORDS (20.000)
>
BUILDING CODE BOARD OF APPEALS
>
2000-2019 Building Code Board of Appeals Agendas and Packets
>
2018 Building Code Board of Appeals Agendas and Packets
>
Building Code Board of Appeals Agenda and Packet 2018 02 15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2021 2:00:21 PM
Creation date
2/21/2018 7:57:59 AM
Metadata
Fields
Template:
City Council Records
Doc Type
Boards Commissions Committees Records
Supplemental fields
Test
BCBOAPKT 2018 02 15
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
piping schematic, stucco/EIFS submittal, factory -built fireplace product <br />information, and Planning Department items, siding details, etc. -IRC <br />R107 Need to get approval with the building official as far as deferred <br />submittal. Maybe require a separate form be submittal to Building Official <br />to sign off on. <br />A60. Sills of exterior windows which are located more than 6 feet above <br />grade, and less than 24 inches above the interior floor surface must meet <br />some new requirements. The area of the window less than 24 inches <br />above the interior floor surface must now be fixed or have an opening or <br />a guard which does not allow the passage of a 4 inch diameter sphere. <br />R312 <br />A61. A permanent certificate shall be posted on a wall in the space where <br />the furnace is located or a utility room or electrical panel (must not cover <br />obstruct the visibility of circuit directory) predominant R -values of <br />insulation installed in or on ceiling /roof, walls, foundation, (slab, basement <br />wall, crawlspace wall and /or floor) and ducts outside the conditioned <br />spaces; U -factors of windows, and the solar heat gain coefficient of <br />windows. The type and efficiency of heating, cooling and service water <br />heating equipment shall also be listed. Note: The listing of the electrical <br />panel will not allow you to drill or modify the panel or cover in any way to <br />accomplish this. IRC N1101.14 <br />A62. Define the location of the thermal envelope. <br />A63. Note all interior and exterior wall bracing and hold downs. <br />Additional Architectural Comments <br />STRUCTURAL: <br />Page 12 of 21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.