Laserfiche WebLink
Boulder County, CO 03643183 <br />DO NOT CUT SINGLE LEADER. PRUNE DAMAGED <br />OR DEAD WOOD AND CO -DOMINANT LEADERS <br />AT LANDSCAPE ARCHITECT'S DIRECTION ONLY. <br />12" NYLON TREE STRAP ON GUY <br />WIRE AND AROUND TREE TRUNK. <br />1/2" DIAM. WHITE PVC PIPE SECTION ON <br />ENTIRE LENGTH OF EACH WIRE. <br />14 GAUGE GALVANIZED WIRE, DOUBLE <br />STRAND TWISTED. <br />6' STEEL T -POST (2 MIN.) (4' EXPOSED) <br />WRAP ENTIRE SURFACE OF TRUNK TO SECOND <br />BRANCH WITH SPECIFIED TREE WRAP MATERIAL <br />SECURED AT TOP AND BOTTOM & AT 2 -FT. <br />INTERVALS. RE: SPECS FOR TIMING. <br />SET ROOT COLLAR 3" HIGHER THAN GRADE <br />AT WHICH TREE GREW <br />48" CIRCLE OF SHREDDED BARK MULCH (4" DEEP) <br />AROUND BASE OF TREES IN GRASS AREAS. <br />FORM SAUCER AROUND EDGE OF TREE PIT <br />FINISH GRADE <br />REMOVE ALL TWINE AND WIRE BASKET ENTIRELY. <br />PULL BURLAP BACK 2/3 MINIMUM <br />—" SLOPE SIDES OF PIT AS SHOWN. ROUGHEN SIDES <br />PRIOR TO BACKFILLING. <br />2 x ROOTBALL DIA. <br />SPECIFIED BACKFILL MIXTURE <br />STAKE TO EXTEND MIN. 24" INTO UNDISTURBED <br />SOIL. <br />UNDISTURBED SUBGRADE <br />ANY BROKEN OR CRUMBLING ROOTBALL WILL BE <br />REJECTED. REMOVING THE WIRE WILL NOT BE AN <br />EXCUSE FOR DAMAGED ROOTBALLS. <br />REMOVE STAKING AFTER ONE YEAR. <br />SHADE TREE PLANTING <br />NOT TO SCALE <br />2 x ROOTBALL DIA. <br />CLUMP TREES SHALL HAVE SPECIFIED NUMBER <br />OF TRUNKS. SHRUB FORMS WILL BE REJECTED. <br />DO NOT CUT LEADER. PRUNE DAMAGED OR DEAD <br />WOOD IMMEDIATELY PRIOR TO PLANTING. <br />WATER RING - INSTALL AT END OF PLANTING, <br />REMOVE PRIOR TO SODDING OR IRRIGATED <br />SEEDING. <br />PLANT ROOTBALL 2" HIGHER THAN WHICH IT GREW <br />(IN IRRIGATED AREAS) IN NON -IRRIGATED AREAS <br />PLANT TREE AT GRADE WHICH IT GREW. <br />APPLY 4" OF BARK MULCH TO THE OUTSIDE EDGE <br />OF SAUCER UPON PLANTING <br />APPLY 18-24" RING OF BARK MULCH 4" DEEP UPON <br />COMPLETION OF SEEDING OR SODDING <br />FINISHED GRADE <br />CUT AND REMOVE BURLAP FROM TOP AND SIDES <br />OF ROOTBALL. REMOVE ALL WIRES AND NYLON <br />TIES. IF TREE IS IN FIBER POT, REMOVE PRIOR TO <br />PLANTING. <br />ANY BROKEN OR CRUMBLING ROOTBALL WILL BE <br />REJECTED. REMOVING THE WIRE WILL NOT BE AN <br />EXCUSE FOR DAMAGED ROOTBALLS. <br />SPECIFIED BACKFILL MIXTURE AND FERTILIZER <br />APPLICATION. <br />HOLE SHOULD HAVE ROUGHENED SIDES <br />CLUMP TREE PLANTING <br />NOT TO SCALE <br />CITY OF LOUISVILLE, COUNTY OF BOULDER, STATE OF COLORADO <br />LOT 1, BLOCK 1 - THE PARK AT C.T.C. FIRST FILING -1ST AMENDMENT <br />2 x ROOTBALL DIA. <br />DO NOT CUT OR DAMAGE LEADER <br />RUBBER HOSE (1/2" DIA.) OR 12" NYLON <br />TREE STRAP ON GUY WIRE TO PROTECT TREE <br />#12 GALVANIZED WIRE TWISTED DOUBLE <br />STRAND. MIN. 3 GUY WIRES PER TREE. <br />1/2" DIA. X 36" LONG WHITE PVC PIPE <br />ON EACH GUY WIRE <br />SET ROOTBALL 3" HIGHER THAN GRADE AT <br />WHICH TREE GREW. <br />APPLY 4" OF BARK MULCH TO THE OUTSIDE EDGE OF <br />SAUCER UPON PLANTING APPLY 18-24" RING OF BARK <br />MULCH 4" DEEP UPON COMPLETION OF SEEDING OR <br />SODDING <br />FINISHED GRADE <br />30" METAL "T" STAKE. DRIVE VERTICALLY <br />INTO UNDISTURBED SOIL, FLUSH W/GRADE <br />REMOVE BURLAP FROM TOP 2/3 OF ROOTBALL <br />REMOVE WIRE COMPLETELY FROM ROOTBALL <br />UNDISTURBED SUBGRADE <br />SPECIFIED BACKFILL MIXTURE HOLE SHOULD <br />HAVE ROUGHENED SIDES AND FERTILIZER <br />APPLICATION REMOVE GUYING AFTER ONE YEAR. <br />EVERGREEN TREE PLANTING <br />3'-0" MIN. <br />IRRIGATION NOTE <br />NOT TO SCALE <br />CONCRETE CURB OR SIDEWALK <br />PRUNE ALL DAMAGED OR DEAD WOOD IMMEDIATELY <br />PRIOR TO PLANTING <br />SET SHRUB 1" HIGHER THAN THE GRADE AT WHICH IT <br />GREW <br />DIG PLANT PIT TWICE AS WIDE OR MORE AS THE <br />CONTAINER <br />APPLY SPECIFIED MULCH 4" DEEP <br />OVER SPECIFIED WEED MAT. <br />FINISHED GRADE <br />ALL JUNIPER PLANTS SHOULD BE PLANTED SO TOP <br />OF ROOT MASS OCCURS AT FINISH GRADE OF MULCH <br />LAYER <br />LOOSEN SIDES OF PLANT PIT AND ROOTBALL <br />REMOVE CONTAINER <br />BACKFILL: ONE THIRD ORGANIC MATTER <br />TWO THIRDS SITE SOIL THOROUGHLY MIXED <br />ANY BROKEN OR CRUMBLING ROOTBALL WILL BE <br />REJECTED. REMOVING THE CONTAINER WILL NOT BE <br />AN EXCUSE FOR DAMAGED ROOTBALL <br />SHRUB PLANTING <br />NOT TO SCALE <br />CONTRACTOR SHALL COORDINATE WITH THE CITY AND CTC OWNER AND MAINTENANCE GROUP THE <br />LOCATIONS OF THE EXISTING IRRIGATION MAINLINES, LATERAL LINES, WIRING, AND HEADS IN THE FIELD. <br />CONTRACTOR SHALL ISOLATE THE EXISTING IRRIGATION SYSTEM AT THE CORNER OF DOGWOOD ST. AND <br />CHERRY ST. FROM THE PUBLIC SYSTEM. CUT, CAP, EXTEND, AND RECONNECT ALL MALL IRRIGATION <br />MAINLINE, LATERAL LINES, AND WIRING AS NECESSARY. IMMEDIATELY REPAIR AND/OR REPLACE ANY <br />EXISTING IRRIGATION DAMAGED DURING CONSTRUCTION. ADJUST EXISTING IRRIGATION AS NECESSARY TO <br />MAINTAIN PROPER COVERAGE OF IRRIGATION TO REMAIN. <br />CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING EXISTING PUBLIC RIGHTS-OF-WAY IRRIGATION IN <br />PROPER FUNCTIONING ORDER DURING CONSTRUCTION. ONCE CONSTRUCTION IS COMPLETE, THE <br />CONTRACTOR SHALL ENSURE PUBLIC RIGHTS-OF-WAY SYSTEM IS WORKING TO THE SATISFACTION OF THE <br />CTC OWNER/MAINTENANCE GROUP. <br />LANDSCAPE NOTES <br />1. COORDINATION <br />THIS LANDSCAPE ARCHITECTURAL SITE PLAN IS TO BE USED IN CONJUNCTION WITH THE CIVIL, ARCHITECTURAL, MECHANICAL, <br />ELECTRICAL, STRUCTURAL AND IRRIGATION PLANS AND SPECIFICATIONS TO FORM COMPLETE INFORMATION REGARDING THIS SITE. <br />2. COMPLIANCE <br />CONSTRUCTION SHALL CONFORM TO ALL APPLICABLE STATE AND LOCAL CODES. <br />3. GUARANTEE <br />ALL MATERIALS AND WORKMANSHIP SHALL BE GUARANTEED FOR ONE YEAR, FROM DATE OF FINAL ACCEPTANCE, AT NO ADDITIONAL COST <br />TO THE OWNER. <br />4. COMPLETION AND MAINTENANCE <br />A. FINAL ACCEPTANCE: WITHIN TEN DAYS OF CONTRACTOR'S NOTICE THAT THE ENTIRE PROJECT IS COMPLETE, THE L.A. SHALL REVIEW <br />INSTALLATION. IF FINAL ACCEPTANCE IS NOT GIVEN, THE L.A. SHALL PREPARE A PUNCH LIST OF PENDING ITEMS. THE PUNCH LIST ITEMS <br />SHALL BE COMPLETED BY THE CONTRACTOR WITHIN TEN CALENDAR DAYS FROM DATE ISSUED. SUBSEQUENT REVIEW AND APPROVAL <br />SHALL SIGNIFY ACCEPTANCE. <br />B. MAINTENANCE: ALL LANDSCAPING SHALL BE MAINTAINED FROM INSTALLATION TO FINAL ACCEPTANCE. MAINTENANCE SHALL INCLUDE <br />WATERING, FERTILIZING, WEEDING, MOWING, TRIMMING, ROLLING, REGRADING, REPLANTING, DISEASE AND INSECT PROTECTION. <br />5. SITE CONDITIONS <br />LANDSCAPE CONTRACTOR SHALL EXAMINE THE SITE CONDITIONS UNDER WHICH THE WORK IS TO BE PERFORMED AND NOTIFY THE <br />GENERAL CONTRACTOR IN WRITING OF UNSATISFACTORY CONDITIONS. DO NOT PROCEED UNTIL CONDITIONS ARE CORRECTED. <br />LANDSCAPE CONTRACTOR SHALL BE RESPONSIBLE FOR FINISHED GRADES AND POSITIVE DRAINAGE IN LANDSCAPE AREAS. <br />6. DAMAGE AND CLEANING <br />A. CONTRACTOR SHALL REPAIR OR REPLACE ALL ITEMS DAMAGED DUE TO THIS WORK AT NO ADDITIONAL COST TO THE OWNER. <br />B. CONTRACTOR SHALL CLEAN ALL AREAS DUE TO THIS WORK AND PROPERLY REMOVE ALL UNUSED MATERIALS FROM SITE. <br />7. RIGHT OF REJECTION <br />OWNER/LANDSCAPE ARCHITECT RESERVES THE RIGHT TO REJECT ANY MATERIALS AT ANY TIME. ALL PLANT MATERIALS SHALL MEET THE <br />MINIMUM CURRENT "AMERICAN STANDARDS FOR NURSERY STOCK" BY THE AMERICAN ASSOCIATION OF NURSERYMEN. CONTRACTOR <br />SHALL PROVIDE SAMPLES, SPECS., AND OR TAGS FOR ALL MATERIALS. <br />8. SOIL PREPARATION <br />SOD AND SHRUB BED AREAS SHALL RECEIVE SIX INCHES OF APPROVED TOPSOIL. AMEND SOIL WITH FOUR CUBIC YARDS PER THOUSAND <br />SQUARE FEET OF ORGANIC COMPOST. COMPOST TO HAVE A C:N RATIO BETWEEN 15:1 AND 30:1, LESS THAN 6 mmhos/cm SALT CONTENT, A <br />pH BETWEEN 6.5 AND 8.5, AND OVER 30% ORGANIC MATTER. APPLY 5 LBS. OF 20-10-5 GRANULAR FERTILIZER PER THOUSAND SQ. FEET. <br />ROTOTILL AMENDMENTS AND TOPSOIL TO A DEPTH OF SIX INCHES. VERIFY SOIL PREP SPECIFICATIONS WITH WATER PROVIDER <br />STANDARDS. PROVIDE EVIDENCE OF APPLICATION AS REQUIRED. TEST SOIL IN EXISTING ASPHALT AREAS FOR STERILANT USE. IF <br />STERILANTS ARE FOUND PRESENT, REMOVE ALL CONTAMINATED SOIL AND REPLACE WITH NEW TOPSOIL. <br />9. PLANTING <br />TREES AND SHRUBS SHALL BE PLANTED PER DETAILS. STAKE AND GUY TREES PER DETAILS. TREE AND SHRUB BED LOCATIONS SHALL BE <br />APPROVED PRIOR TO PLANTING. BACKFILL WITH 1/3 SOIL AMENDMENT AND 2/3 SITE SOIL, THOROUGHLY MIXED. FERTILIZE AS <br />RECOMMENDED WITH AGRIFORM TABLETS. <br />10. EDGER <br />INSTALL 4" ROLL-TOP RYERSON STEEL EDGING (14 GAUGE WITH GREEN FINISH) OR EQUAL. INSTALL WITH STAKES AND SPLICERS PER <br />MANUFACTURER'S RECOMMENDATIONS. INSTALL BETWEEN ALL SOD OR SEEDED AREAS AND MULCHED AREAS AND ALONG OUTER <br />PROJECT PERIMETER. <br />11. MULCH <br />INSTALL 1"-2" ANGULAR MTN. GRANITE IN ALL PLANTING AREAS PLACED OVER DEWITT PRO 5 FILTER FABRIC, 3" DEEP. PROVIDE SHREDDED <br />WESTERN RED CEDAR WOOD MULCH PLACED AT BASE OF ALL SHRUBS AND TREES. (SUBMIT SAMPLES) <br />12. MAINTENANCE <br />THE PROPERTY OWNER OF RECORD, THE OWNER'S AGENT OR TENANT SHALL KEEP ALL LANDSCAPING IN A WELL MAINTAINED AND <br />HEALTHY GROWING CONDITION. <br />13. IRRIGATION <br />THE LANDSCAPE CONTRACTOR IS RESPONSIBLE TO INSTALL AN AUTOMATIC IRRIGATION SYSTEM TO INCLUDE IRRIGATION TO ALL <br />PROPOSED PLANT MATERIAL. TURF AREAS SHALL BE IRRIGATED WITH SPRAY HEADS, WHILE TREES AND SHRUBS SHALL BE IRRIGATED <br />USING DRIP IRRIGATION. SEEDED AREAS SHALL RECEIVE TEMPORARY IRRIGATION FOR AN ESTABLISHMENT PERIOD OF ONE (1) YEAR. <br />PUBLIC WORKS SHALL INSPECT AND APPROVE THE IRRIGATION SYSTEM OPERATION WITHIN THE RIGHT OF WAY. CONTRACTOR SHALL <br />ADJUST IRRIGATION HEADS AS NECESSARY TO ELIMINATE TO THE GREATEST EXTENT POSSIBLE ANY OVERSPRAY ONTO PAVED <br />SURFACES. <br />14. SEEDING <br />THE CONTRACTOR SHALL BE RESPONSIBLE TO ESTABLISH A HEALTHY, WEED FREE, STAND OF GRASS DURING THE ESTABLISHMENT <br />PERIOD. <br />15. THE CONTRACTOR SHALL BE RESPONSIBLE TO ENSURE THE NATIVE GRASS THAT IS TO REMAIN IS ALSO HEALTHY AND WEED FREE <br />DURING THE ESTABLISHMENT PERIOD. <br />16. ROOT BARRIERS <br />ROOT BARRIERS SHALL BE INSTALLED PER MANUFACTURER'S INSTRUCTIONS. <br />NATIVE PRAIRIE SEED MIX <br />PBSI NATIVE PRAIRIE MIX <br />(29%) Blue Grama <br />(10%) Buffalo grass <br />(20%) Green Needle grass <br />(20%) Sideoats Grama <br />(20%) Western Wheatgrass <br />(1%) Sand Dropseed <br />APPLICATION RATE: <br />15 PLS lbs/Acre <br />*MIX PROVIDED BY PAWNEE BUTTES SEED INC. 1-800-782-5947 <br />SEEDING SPECS. <br />SUBMIT ALL SEEDING, MULCHING, AND WATER SCHEDULE SPECIFICATIONS TO LANDSCAPE <br />ARCHITECT FOR FINAL APPROVAL. THE CONTRACTOR SHALL BE RESPONSIBLE TO <br />ESTABLISH A HEALTHY AND WEED FREE STAND OF GRASS. <br />SOIL PREP: APPLY STOCKPILED TOPSOIL AND 100 LBS. OF DIAMMONIUM PHOSPHATE PER <br />ACRE TO AN APPROVED SUBGRADE. USE A DISK OR HARROW TO PREPARE THE SEED BED <br />AND COMPLETE FINISH GRADING. <br />SEEDING: USE A GRASS DRILL WITH A SEED AGITATOR TO ENSURE THAT THE SEED IS <br />DRILLED EVENLY TO A 1/2" DEPTH. HAND BROADCAST SEED AT TWICE THE RATE IN AREAS <br />WHERE DRILL SEEDING CANNOT BE ACCOMPLISHED. <br />MULCH: CRIMP HAY OR STRAW INTO THE SOIL AT 3,000 LBS. PER ACRE. <br />WATER: CONTRACTOR SHALL APPLY 1/2" OF WATER TO SEED AREAS, TWICE PER WEEK, <br />FOR THREE WEEKS. CONTRACTOR TO SUPPLY ALL EQUIPMENT AND LABOR. <br />RESEED AND MULCH BARE OR ERODED AREAS AT ONE (1) MONTH INTERVALS AS <br />NECESSARY. <br />PREPARED UNDER THE DIRECT SUPERVISION OF <br />JONATHAN SPENCER, LANDSCAPE ARCHITECT <br />COLORADO REGISTRATION #111 <br />FOR & ON BEHALF OF STERLING DESIGN ASSOCIATES, LLC <br />PRELIMINARY <br />NOT FOR CONSTRUCTION <br />w <br />z <br />0 <br />a <br />w <br />1- <br />z <br />w <br />m <br />0 <br />0 <br />0 <br />a <br />H <br />z <br />w <br />0 <br />z <br />w <br />1- <br />N <br />0 <br />a <br />L <br />0 <br />U <br />z <br />cri <br />L.1 <br />-o <br />S <br />< <br />o� <br />z <br />Q + <br />z2 <br />1111111. c <br />O (7) <br />2� <br />N O <br />■ <br />O N <br />CD <br />0 <br />z <br />O <br />N <br />w <br />0 <br />0 <br />N) <br />N <br />I <br />N <br />0 <br />rr) <br />r) <br />N <br />0 <br />co <br />Denver, Colorado <br />DESIGNED BY: DLS <br />DRAWN BY: STC <br />CHECKED BY: DS <br />DATE: 01 /01/2018 <br />(1) <br />J_ <br />w <br />0 <br />0 <br />Z <br />VJ <br />w <br />0 <br />Z <br />w <br />0 <br />VJ <br />0 <br />Z <br />0 <br />z <br />J <br />LL <br />0) <br />T. <br />1 <br />F <br />0 <br />0 <br />w <br />0 <br />0 <br />J <br />m <br />0 <br />J <br />0 <br />0 <br />Z� <br />w0 <br />O <br />U <br />z <br />UJ <br />2J <br />Q J_ <br />E— <br />D <br />0 <br />J <br />powers <br />brown <br />arch it <br />ecture <br />PROJECT NO. <br />096501001 <br />DRAWING NAME <br />LANDSCAPE DETAILS <br />7 <br />