Laserfiche WebLink
EXHIBIT A <br />DESCIPTION OF THE WORK <br />The Work associated with this Second Interim Agreement includes the following: <br />o Update by Black&Veatch of the SWSP System hydraulics and transient analysis. <br />• Update by Black&Veatch of the Eastern Pump Station Preliminary Design. <br />• Preparation by Black&Veatch of 30 percent, 60 percent, 90 percent, and Final Plans and <br />Specification. <br />• Assistance by Black&Veatch in bidding services. <br />• Preparation by SWSP Enterprise of SCADA design. <br />o Station electrical utility service analysis. <br />• Project review and oversight. <br />• Legal. assistance. <br />