My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Open Space Advisory Board Agenda and Packet 2018 06 13
PORTAL
>
BOARDS COMMISSIONS COMMITTEES RECORDS (20.000)
>
OPEN SPACE ADVISORY BOARD
>
2000-2019 Open Space Advisory Board Agendas and Packets
>
2018 Open Space Advisory Board Agendas and Packets
>
Open Space Advisory Board Agenda and Packet 2018 06 13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 8:21:26 AM
Creation date
6/15/2018 10:22:17 AM
Metadata
Fields
Template:
City Council Records
Doc Type
Boards Commissions Committees Records
Supplemental fields
Test
OSABPKT 2018 06 13
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Town of Lyons 2015 Requests <br />Lead <br />Status <br />1 <br />Lyons to St. Vrain Corridor. Trail Extension to Route 36 underpass <br />(repair needed?) with eventual connection to Lyons to Boulder Trail <br />and St. Vrain Greenway Trail--underpass connections on east side of <br />Hwy 36. <br />From 2013 Request: <br />• Town currently working on connecting to Rt. 36 underpass west of <br />underpass. The County is currently working on the Boulder Feeder <br />Canal Trail and St. Vrain Greenway Trail. <br />• Maps and information currently on file with County <br />• This would be a major link between Boulder & Lyons and Longmont <br />& Lyons, as well as assist with all of the pedestrian traffic along <br />Hwys 36/66. <br />• 2012 amendment: include assistance from the county to connect on <br />Lyons <br />From 2013 Status Report: <br />Boulder County worked to develop a master plan for the <br />proposed Lyons to Boulder Regional Trail (formerly known as <br />the feeder canal trail) in 2008 and 2009, developing three <br />alternative alignments with extensive public input. The County <br />Commissioners suspended planning process in Fall 2009 after <br />the Northern Colorado Water Conservation District rescinded <br />their trail development guidelines, making it clear that they <br />were unlikely to grant permission in the near future for use of <br />the Feeder Canal for any part of the Lyons to Boulder trail. <br />Response to the 2012 amended request: This grade-separated <br />connection is in the Boulder County Transportation Master <br />Plan, which was adopted in Fall 2012. The County supports <br />Lyons' amendment and will work with Lyons and CDOT to <br />complete this connection. The underpass design should enable <br />future connections to LYBO and St. Vrain trails. <br />the east side to the underpass to assist in getting cyclists off of the <br />highway and onto the trail. With the Lyons to Boulder Trail being <br />put on hold, the cycling traffic in this area is heavy and the bike <br />lanes into Lyons along this stretch are very narrow making the area <br />dangerous, particularly in the summer months. We are hoping to <br />create an easy connection somehow to the underpass to get cyclists <br />onto the trail, which we hope to create as a two lane hard surface, <br />suitable for such bikes. This trail was part of our Lyons Valley River <br />Park grant which we intend to pursue in smaller more manageable <br />increments. Connection to the underpass is an issue however, and <br />was not included in the grant. Please let me know should you have <br />any questions. <br />42 <br />
The URL can be used to link to this page
Your browser does not support the video tag.