My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Open Space Advisory Board Agenda and Packet 2018 06 13
PORTAL
>
BOARDS COMMISSIONS COMMITTEES RECORDS (20.000)
>
OPEN SPACE ADVISORY BOARD
>
2000-2019 Open Space Advisory Board Agendas and Packets
>
2018 Open Space Advisory Board Agendas and Packets
>
Open Space Advisory Board Agenda and Packet 2018 06 13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 8:21:26 AM
Creation date
6/15/2018 10:22:17 AM
Metadata
Fields
Template:
City Council Records
Doc Type
Boards Commissions Committees Records
Supplemental fields
Test
OSABPKT 2018 06 13
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Town of Nederland 2015 Requests <br />Lead <br />Status <br />1 <br />County Road 130 Connector Trail to Nederland High School. <br />This multi -use trail along County Road 130 will connect the town of Nederland to <br />Middle/Senior High School and National Forest trails. The trail will stay within the <br />right-of-way. A compacted crusher fine finish for the trail is preferable if the trail <br />constructed away from the road. The estimated cost for 3,600 linear feet is $72,000 <br />$25,000 for crossing improvements, totaling $97,000. Black top or concrete will be <br />along with a barrier if the trail is located adjacent to the road. Local excavators have <br />time and equipment to help with the trails project. <br />The Town of Nederland was previously awarded a GOCO grant for trails, but this <br />trail could not be built with the available funds. Current trail construction will end <br />connector trail would start and would link this southern area to Mud Lake and Caribou <br />Open Spaces. <br />This project will support non -motorized transportation for students and teachers <br />NMSHS, promoting health and fitness. It will also connect the town of Nederland <br />RTD bus station to the West Magnolia Forest Service Trail System. This trail has been <br />a high priority in the Nederland Trails Master Plan (2005). <br />Old Town.. <br />' a •'a- Nederland $, `1.9 <br />1 ".` y _ fir _•4 lr _ VI <br />R. <br />�• West Magnolia <br />'. ' Trail System <br />fir. <br />Nederland <br />County <br />can <br />particular <br />where <br />to <br />and <br />be <br />+ <br />necessary <br />pledged <br />this <br />Ranch <br />and from <br />the <br />listed as <br />TR <br />No change from 2013 Status Report: <br />This trail segment is included in the <br />preliminary list of projects for the <br />Transportation Sales Tax Extension <br />passed by voters in November 2007. <br />Boulder County Transportation has had <br />conversations with Boulder Valley <br />School District and the Town to pursue <br />additional funding for design and <br />construction of the connection. <br />45 <br />
The URL can be used to link to this page
Your browser does not support the video tag.