Laserfiche WebLink
SUBJECT: CONTINUATION OF BUDGET RETREAT — C-I-P <br />DATE: AUGUST 2, 2018 PAGE 2 OF 4 <br />16) CIP# 29 — Staff revised Community Park Stage Improvements to include cost for <br />alternatives (i.e. relocating, constructing new facility) to address sound issues. <br />17) CIP #30 — Staff revised Space Needs Study to include additional alternatives <br />(i.e. City Hall addition, White House remodel, new facility). <br />18) CIP#31 — Staff revised Utility line undergrounding to include match from <br />Louisville Revitalization Commission (LRC) for downtown project. <br />19) CIP#32 — Staff revised Document Management to include operational impact <br />and additional details on automation. <br />20) CIP#34 — Staff revised Patio Expansion to include additional details on year-to- <br />date expenditures on patios. <br />21) CIP#40 — Staff revised Bus Stop Improvements to include trash/recycling bins <br />and added operational impact. <br />22) CIP#42 — Staff revised Police Department Basement Restrooms and Lockers <br />and combined with sleep room request. <br />23) CIP#56 — Staff revised Street lighting Upgrades to reduce number of lights to <br />one location (South Boulder Rd and Via Appia), include comprehensive plan for <br />all lighting improvements (i.e. smart streetlights, light pollution, etc.) and include <br />details from Xcel on fixtures/pricing. <br />24) CIP#57 — Staff revised Downtown Clay/Concrete Paver to include match from <br />LRC. <br />25) CIP#59 — Staff revised ADA Parking to include match from LRC. <br />26) CIP#58 — Staff revised Downtown Tree Grate Conduit to include match from <br />LRC and coordination with other departments on irrigation/tree replacement. <br />27) CIP#60 — Staff revised Painting Street Light Poles to include consideration of <br />any streetlight replacement before proceeding. <br />28) CIP#65 — Staff revised Downtown Ornamental Light Replacement to include <br />match from LRC, comprehensive plan for all lighting improvements (i.e. smart <br />streetlights, light pollution, etc.) and details from Xcel on fixtures/pricing. <br />At the August 2 meeting staff plans to present and review the remaining CIP requests <br />that have not been reviewed by Council. (Beginning on page 88; CIP #67 of the July 12 <br />meeting packet.) <br />JULY 12 INFORMATION: <br />SUMMARY <br />The attached 2019-2024 Capital Improvements Plan (C-I-P) reflects a preliminary <br />recommendation from the City Manager. Although the C-I-P is presented as a separate <br />document, it is an integral part of the overall biennial budget process. Based on Council <br />discussion and direction at the Budget Retreat, the City Manager will include a final CI- <br />P recommendation with the 2017-2018 Recommended Biennial Budget in September. <br />Process & Scope <br />CITY COUNCIL COMMUNICATION <br />