Laserfiche WebLink
SUBJECT: BUDGET RETREAT <br />DATE: JULY 12, 2018 <br />PAGE 15 OF 17 <br />Water Utility Fund <br />1111 2019 2020 2021 2022 2023 2024 6-Year <br />Project Description Planned Planned Planned Planned Planned Planned Totals <br />SBR Ditch Lining <br />Water Line Replacement <br />Floride Equipment Replacement <br />Louisville Lateral Ditch Piping <br />NCWCD SWSP Eastern Pump Station <br />NCWCD SWSP Transmission Capacity <br />NCWCD-Windy Gap Firming Project <br />PRV Improvements <br />SCWTP Builidng Upgrades <br />SCWTP Recycle Pond Improvements <br />WTP Vehicle& Equipment Replacement <br />Excavation Shoring Box (75 f ) <br />Barricades &Barricade Trailer (25%) <br />Arterial Snow Plow Replacement (30%) <br />Utility Meter -Reading Truck Replacement <br />Utility Trailers (33%) <br />Water Utility Trucks <br />Fire Hydrant Painting <br />WTP Chemical Storage Tanks <br />Marshall Lake Sediment Control <br />WTP Tank Cleaning & Evaluation <br />WTP Vault Painting <br />WTP Raw Water Study <br />Utilities Electrical Assessment (50%) <br />Water Rights Acquisition <br />Pump Replacement& Rehabilitation <br />SCWTP Filter Media Replacement <br />Meter Replacement <br />Total Water Utility Fund <br />86,150 88,310 90,510 - 264,970 <br />344,000 873,000 205,000 205,000 483,000 140,000 2,250,000 <br />105,000 - - 105,000 <br />2,693,000 - 2,693,000 <br />93,000 - - 93,000 <br />129,000 1,324,000 - 1,453,000 <br />747,000 747,000 747,000 747,000 747,000 747,000 4,482,000 <br />75,000 - 75,000 <br />523,000 - 523,000 <br />86,000 - 86,000 <br />35,000 84,444 43500 163,500 <br />9,000 - 9,000 <br />5,030 - 5,030 <br />84,044 - 84,000 <br />40,000 - - - - - 40,000 <br />4,620 - - - - - 4,620 <br />80,000 - - - - 84,000 <br />106000 - - - - 106,000 <br />405,000 - 405,000 <br />110,000 566,000 - 676,000 <br />50,000 48,000 - 98,000 <br />225,000 - 225,000 <br />75,000 100,000 - 175,000 <br />32,500 - - 32,500 <br />565,000 552,000 566,000 580,000 2,263,000 <br />84,000 276,000 17,000 - 377,000 <br />447,000 - 447,000 <br />754,000 773,000 1,527,000 <br />2.445.800 4.035.810 2,357,511) 4.521,0131) 3.1)94.000 2,288,500 18.742.6213 <br />Wastewater Utility Fund <br />Project Description <br />2019 2020 2021 2022 2023 2024 6-Year <br />Planned Planned Planned Planned Planned Planned Totals <br />V.P;g 7PAdditional Influent Pump 72,000 - 72,000 <br />WWTPAsphaltAddition 50,000 - 50,000 <br />WWTP Digester and Reuse Lighting Improvements 40,000 - 40,000 <br />WWTP Digester Control Improvements 100,000 - - - - - 100,000 <br />Reuse System Equipment Replacement 32,010 66,000 - - - - 98,000 <br />WAIT? Tractar 62,000 - - - - - 62,000 <br />WWTP Digester and Digester Lights 40,000 - - - - - 40,000 <br />WWTPAeration Basin & Reuse Movers 150,000 - 150,000 <br />WNW Total Suspended Solids (ESS) Probes 45,000 - 45,000 <br />WIMP Vac Dump Station 235,000 - 235,000 <br />Excavation Shoring Box(25I) 3,000 - 3,000 <br />Sewer Line Replacement 300,000 275,000 420,000 400.000 350,000 425,000 2,170,000 <br />Portable Lift Station Pump 50,000 - 54,000 <br />Barricades & Barricade Trailer (25%) 5,030 - - - - - 5,030 <br />Utility Trailers (33%) 4,620 - - - - - 4,620 <br />Replacement Vacuum Truck 210,000 - - - - 210,000 <br />OPS Lift Station Painting - 75,000 - 75,000 <br />Drum Thickener Replacement - 275,000 - 275,000 <br />Utilities Electrical Assessment (50%) - 32,500 - 32,500 <br />WIMP Vehicle Replacement - 37,000 - - 48,500 65,500 <br />WWTP Dew atering Buikting Upgrades - - 76,000 753,000 - 829,000 <br />Total Wastewater Utility Fond 1,393,650 760,540 496,000 1,153,000 350.000 473,500 4,631,650 <br />CITY COUNCIL COMMUNICATION <br />16 <br />