Laserfiche WebLink
Revitalization Commission <br />Minutes <br />July 30, 2018 <br />Page2of2 <br />None <br />Reports of Commission <br />Business Matters of Commission <br />Parking Structure Conceptual Design <br />Representatives from Desman Associates presented two basic parking garage <br />designs with the idea this structure will serve the city for the next 50 years or more. <br />The structures would include at least 225-250 parking spots, and ideally, the parking <br />spots would be 9' wide spaces with each level at 12-14' in height from floor to floor. <br />Desman also presented pros/cons for each structure, parking efficiency, natural <br />lighting, flat -floor parking, future paid parking, EV charging stations, pedestrian <br />connection from Main Street to Front Street, leaving access to the alley or closing it <br />off, and future development off Elm Street. Their presentation included a North/South <br />basic concept and an East/West basic concept. This is just an initial phase of structure <br />ideas and structures that will fit the layout of the area. <br />LRC will try to find a late August date for a special meeting to discuss new design <br />alternatives. Concepts will be selected at the meeting to be shown at a public meeting <br />for input in September. <br />Discussion Items for August 13, 2018 Meeting <br />• DeJong will send out over email dates to consider for a Parking structure <br />special meeting in late August <br />• For 8/13, begin 2019 LRC Budget Discussion <br />• Potential discussion with DBA representatives <br />Commissioners Comments: <br />None <br />Adjourn: <br />The meeting adjourned at 9:00 am. <br />