My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
City Council Agenda and Packet 2018 09 11 SP
PORTAL
>
CITY COUNCIL RECORDS
>
AGENDAS & PACKETS (45.010)
>
2010-2019 City Council Agendas and Packets
>
2018 City Council Agendas and Packets
>
City Council Agenda and Packet 2018 09 11 SP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 2:12:29 PM
Creation date
9/14/2018 10:27:01 AM
Metadata
Fields
Template:
City Council Records
Doc Type
City Council Packet
Original Hardcopy Storage
8D6
Supplemental fields
Test
CCAGPKT 2018 09 11 SP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
peak service frequency to 10 minute frequency from the current 7-8 minute peak frequency, while <br />retaining the current mid -day 10 minute frequency. This change will allow for better on -time <br />performance and a balancing of passenger loads, as well as address current CBA layover/restroom <br />challenges for the route. This proposal also supports additional short -turn trippers between Fairview <br />High School and 14th/Walnut, northbound between 3:00pm and 3:30pm to maintain current 7-8 minute <br />frequency and address otherwise potential overloads caused by BVSD and CU student ridership. No <br />anticipated cost impact due to resource off -set. <br />Route Y — Boulder/ Lyons <br />Service type — Regional — (10%-11.3 pass. per hour/ 25%-21.9 pass. per hour) <br />Discontinue mid -day roundtrips (10:57am and 12:20pm leave Downtown Boulder Station and 11:42am <br />and 1:02pm leave Lyons Park-n-Ride) due to very low ridership (range of 3 — 4 passengers per trip). <br />Anticipated resource impact is estimated to be 637 annual in-service hours <br />Rail <br />F and H Lines — Light Rail <br />Running time analyses to address on -time performance. Resource impacts are to be determined. <br />31 <br />
The URL can be used to link to this page
Your browser does not support the video tag.