0
<br />U
<br />Final Planned Unit Development
<br />Lots 1 & 2, CTC Filing 2, Replat C
<br />Louisville, Colorado
<br />CITY COUNCIL CERTIFICATE
<br />APPROVED THIS ,V DAY OF -PM %U S , 20 l () BY THE
<br />CITY COUNCIL OF THE CITY OF LOUISVILLE, COLORADO.
<br />RESOLUTION NO. ?I/ SERIES 2Olt
<br />M
<br />(4.4
<br />YOR
<br />CITY CLERK
<br />!�
<br />"_. SEAL •i E
<br />•
<br />'r/0r' ORPO0•`�
<br />titIII►t�°°
<br />•
<br />PLANNING COMMISSION CERTIFICATE
<br />RECOMMENDED APPROVAL THIS 12 " DAY OF c,L/l- , 20 tQj
<br />BY THE PLANNING COMMISSION OF THE CITY OF LOUISVILLE, COLORADO.
<br />RESOLUTION NO. ID SERIES
<br />CLERK AND RECORDER CERTIFICATE
<br />(COUNTY OF BOULDER
<br />STATE OF COLORADO)
<br />I HEREBY CERTIFY THATTHIS INSTRUM.NT WAS FILED IN MY OFFICE AT
<br />R.. O'CLOCK, . M., THIS ti DAY OF fOV )Q
<br />20], AND IS RECORDED IN PLAN FILE , FEE
<br />PAID /�3. C O FILM NO. - , RECEPTION o (p41413)o(D .
<br />i11a i4
<br />RECORDER
<br />DEP
<br />OWNERSHIP SIGNATURE BLOCK
<br />BY SIGNING THIS P.U.D., THE OWNER ACKNOWLEDGES AND ACCEPTS ALL
<br />THE REQUIREMENTS AND INTENT SET FORTH IN THIS P.U.D.
<br />WITNESS OUR HANDS AND SEALS THIS / DAY OF I&/ T4L 4 , 20 iS.
<br />CTC PRCP`ERTIES, LLLFJ
<br />KURTiS CAYMAN
<br />Notary Public
<br />State of Colorado
<br />Notary ID # 20134058637
<br />My Commission Expires 09-17-2021
<br />(OWNER)
<br />LAND USE AND PARKING INFORMATION
<br />ZONING: INDUSTRIAL PUD
<br />REOU I RED SETBACKS
<br />PRINCIPAL BUILDINGS:
<br />FRONT (GTG BOULEVARD):
<br />FRONT (IO4TH STREET):
<br />REAR (SAME ZONING) :
<br />SIDE (NORTH-BOXELDER):
<br />51 DE (SOUTH -INTERNAL) :
<br />PROPOSED SETBACKS
<br />PRINCIPAL BUILDING (LOT 1):
<br />FRONT (GTG BOULEVARD):
<br />REAR:
<br />SIDE (NORTH - BOXELDER) :
<br />SIDE (SOUTH) :
<br />PARKING (LOT I) :
<br />FRONT (CTC BOULEVARD):
<br />REAR:
<br />SIDE (NORTH - BOXELDER):
<br />51 DE (SOUTH) :
<br />ALLOWABLE MAXI MUM BUILD I
<br />PROPOSED BU I LD I NC HEIGHT:
<br />LOT I/BUILDING A: 38'-O"
<br />Site Area Breakdown
<br />Lot 1
<br />Building Coverage
<br />Building A
<br />Parking & Drives
<br />Sidewalks
<br />Landscape (plug)
<br />Total
<br />Total Building Area:
<br />Main Floor
<br />Second Floor
<br />Total
<br />Parking
<br />Initial
<br />Deferred
<br />Total
<br />Bicyle Parking
<br />SF %
<br />132,925 34.9%
<br />175,642 46.1%
<br />8,982 2.4%
<br />63,751 16.7%
<br />381,300 100.0%
<br />132,925
<br />132,925
<br />PARKING:
<br />30FRONT (CTC BOULEVARD) : 20'
<br />30' FRONT (IO4TH STREET): N/A
<br />15' REAR (SAME ZONING): N/A
<br />30' SIDE (NORTH-BOXELDER): 20'
<br />10' SIDE (SOUTH -INTERNAL): 10'
<br />a5'f
<br />255'±
<br />a8't
<br />16't
<br />N/A
<br />50'±
<br />12" t
<br />NG HEIGHT:
<br />331 (2.47 spaces/1000 s.f.)
<br />168
<br />499 (3.73 spaces/1000 s.f.)
<br />268 Autos Required
<br />(2.0 spaces/1000 s.f)
<br />1 bike space/20 auto spaces = 13.4 bikes required
<br />4 racks @ 4 bikes per rack = 16 provided
<br />PRINCIPAL BUILDING (LOT 2):
<br />FRONT (104TH STREET): 133'±
<br />REAR: a5't
<br />SIDE (NORTH - BOXELDER): 253'±
<br />SIDE (SOUTH): 4:181t
<br />PARKING (LOT 2):
<br />FRONT (104TH STREET): 56't
<br />REAR: N/A
<br />SIDE (NORTH - BOXELDER): 176'±
<br />SIDE (SOUTH): I2'±
<br />40' (PER G I TY OF LOU I SV I LLE I DDSG)
<br />LOT 2/BUILDING B: 32'-0"
<br />Lot 2
<br />Building Coverage SF %
<br />Building B 154,825 32.4%
<br />Parking & Drives 159,528 33.4%
<br />Sidewalks 9,608 2.0%
<br />Landscape (plug) 154,282 32.3%
<br />Total 478,243 100.0%
<br />Total Building Area:
<br />Main Floor 154,825
<br />Second Floor 10,000
<br />Total 164,825
<br />Parking
<br />Initial
<br />Deferred
<br />Total
<br />Bicyle Parking
<br />279 (1.71 spaces/1000 s.f.)
<br />168
<br />447 (2.74 spaces/1000 s.f.)
<br />326 Autos Required
<br />(2.0 spaces/1000 s.f)
<br />1 bike space/20 auto spaces = 16.3 bikes required
<br />4 racks @ 4 bikes per rack = 16 provided
<br />Total
<br />SF
<br />287,750 33.5%
<br />335,170 39.0%
<br />18,590 2.2%
<br />218,033 25.4%
<br />859,543 100.0%
<br />287,750
<br />10,000
<br />297,750
<br />610 (2.05 spaces/1000 s.f.)
<br />336
<br />946 (3.19 spaces/1000 s.f.)
<br />GENERAL NOTES:
<br />I . THE PROJECT 15 TO BE CONSTRUCTED I N ONE PHASE.
<br />2. CONSTRUCTION MATERIALS ARE AS FOLLOWS:
<br />WALLS: PRE -CAST CONCRETE PANELS PAINTED AS FOLLOWS
<br />COLOR B-I : SHERWI N WI LL I AMS SW 6200 "LINK GRAY"
<br />COLOR 5-2: SHERW I N W I LL I AMS SW 1644 "GATEWAY GRAY"
<br />COLOR 5-5: SHERW I N W I LL I AMS SW 1565 "OYSTER BAR"
<br />COLOR P- I : SHERW I N W I LL I AMS SW 21348 "ROYGROFT PEWTER"
<br />ROOF : .5/12 SLOPED STANDING SEAM METAL ROOF (CONGEALED BY PARAPET ON 3 S I DES)
<br />WINDOWS: ALUM I NUM STOREFRONT - NATURAL ANOD I ZED FINISH
<br />CANOPIES: STRUCTURAL STEEL PAINTED COLOR 'P-I'.
<br />3. THE PROJECT 15 TO BE DESIGNED I N ACCORDANCE WITH THE CRITERIA SET FORTH I N THE
<br />G I TY OF LOUISVILLE INDUSTRIAL DEVELOPMENT DESIGN STANDARDS AND GUIDELINES (I DDSG)
<br />4. ALL EXISTING PUBL I G AND PRIVATE SIDEWALK, CURB, GUTTER AND ASPHALT ADJACENT TO
<br />THE PERIMETER OF THE SITE THAT IS CRACKED, SETTLED, OR OTHERWISE DAMAGED SHALL
<br />BE REMOVED AND REPLACED BY THE CONTRACTOR AS DETERMINED NECESSARY BY THE
<br />G I TY, AS PART OF THE PROJECT, AND AT THE DEVELOPER'S EXPENSE.
<br />5. NO OFF SITE IMPROVEMENTS ARE ANTI C I FATED TO BE REQU I RED I N CONJUNCTION WITH TH I S
<br />PROJECT.
<br />6. ANY ROOF TOP SCREENING SHALL BE SUBJECT TO THE I DDSG OR THE DESIGN REGULATIONS
<br />I N EFFECT AT THE TIME OF INSTALLATION.
<br />1. A PARKING DEFERRAL 15 BEING REQUESTED FOR REQU I RED PARKING I N EXCESS OF 2
<br />SPACES PER 1000 S.F. SEE PLANS FOR LOCATION AND LAYOUT OF DEFERRED PARKING.
<br />8. A WAIVER 15 BEING REQUESTED FOR LANDSCAPE COVERAGE ON LOT I . SINGE THE
<br />DETENTION POND FOR BOTH LOTS 15 LOCATED ON LOT 2, LOT 2 HAS A HIGHER AMOUNT OF
<br />LANDSCAPE AREA. PER THE CHART ABOVE, BOTH LOTS COMBINED MEET THE 25% MINIMUM
<br />REQUIREMENT. ANY FURTHER PUD AMENDMENTS FOR EITHER LOT OR THE LOTS COMBINED
<br />SHALL NOT RESULT IN A LANDSCAPE COVERAGE LESS THAN 25% FOR BOTH LOTS COMBINED,
<br />OR THE MINI MUM LANDSCAPE COVERAGE REQUIREMENT I N EFFECT AT THE TIME, WHICHEVER 15
<br />GREATER.
<br />PROJECT DATA
<br />OWNER/CL I ENT:
<br />CTC PROPERTIES, LLLP
<br />P.O. BOX 445
<br />BROOMF I ELD, COLORADO 80038
<br />303-46a-1857
<br />ARCHITECT:
<br />RVP ARCHITECTURE AND CONSULTING, P.G.
<br />4141 ARAPAHOE AVENUE, SUITE 100
<br />BOULDER, COLORADO 80305
<br />303-443-5355
<br />CIVIL ENGINEER:
<br />HURST * ASSOCIATES, INC.
<br />499Q PEARL EAST G I ROLE, SUITE 106
<br />BOULDER, COLORADO 80301
<br />505-44a-4:1105
<br />LANDSCAPE DESIGN:
<br />NATURE'S DESIGN ASSOCIATES, LLC
<br />15674 I ND I ANA GULCH ROAD
<br />JAMESTOWN, COLORADO 80455
<br />505-45cl-5355
<br />DRAWING INDEX
<br />1 COVER SHEET
<br />2 DEVELOPMENT PLAN
<br />3 ELEVATIONS - BUILDING A
<br />4 ELEVATIONS - BUILDING B
<br />5 LANDSCAPE PLAN - BUILDING A
<br />6 LANDSCAPE PLAN - BUILDING B
<br />7 LANDSCAPE DETAILS
<br />8 UTILITY PLAN
<br />9 GRADING PLAN
<br />10 PHOTOMETRIC PLAN
<br />11 LIGHTING CUT SHEETS
<br />12 SITE DETAILS
<br />South Boulder
<br />N?,,,fxe
<br />Cherry St.
<br />Avast
<br />Hospital
<br />Campus
<br />Lafayette
<br />Louisville 2
<br />GO. ST. HWY. 42 Empire Rd.
<br />Monarch HS
<br />Health Park Dr.
<br />Conoco
<br />Phillips
<br />VICINITY MAP
<br />NO SCALE
<br />0
<br />rJ�
<br />®®
<br />NORTH
<br />LEGAL DESCRIPTION: PART OF THE SOUTHEAST QUARTER OF
<br />SECTION 16, TOWNSHIP 1 SOUTH, RANGE 69 WEST, 6TH PRINCIPAL
<br />MERIDIAN, CITY OF LOUISVILLE, COUNTY OF BOULDER, STA TE OF
<br />COLORADO, DESCRIBED AS FOLL 0 WS• L D TS 1 &2, COLORADO
<br />TECHNOLOGICAL CENTER, FILING NUMBER TWO, REPLA T B.
<br />•
<br />0
<br />U
<br />co O(')
<br />=• Q▪ � N(9
<br />a
<br />r.
<br />c
<br />c c
<br />c a
<br />c To
<br />03
<br />0.2
<br />2
<br />a
<br />O L.
<br />=o
<br />2▪ 0GS of
<br />2
<br />L
<br />N
<br />co
<br />0
<br />d
<br />J
<br />J
<br />J
<br />Iw
<br />v
<br />14:
<br />v
<br />a
<br />0
<br />U
<br />U
<br />2, Replat C
<br />J
<br />O
<br />U
<br />4J
<br />0
<br />PROJ NO: 10-35/17-20
<br />DATE JUNE 13, 2011
<br />REV: 1Q JULY 29, 2011
<br />® NOV. 9, 2014
<br />A AUGUST 5, 2015
<br />® OCT. 15, 2015
<br />® APRIL 13, 2018
<br />® JUNE 18, 2018
<br />® AUG. 8, 2018
<br />Copyright ©2018 - All rights
<br />reserved RVP Architecture and
<br />Consulting, P.C. All design
<br />drawings and written material
<br />herein may not be used or
<br />duplicated without the written
<br />consent of RVP Architecture and
<br />Consulting, P.C.
<br />COVER SHEET
<br />1
<br />SHEET 1 OF 1 2
<br />
|