Laserfiche WebLink
- HORIZONTAL BAND AT WINDOW <br />ROOF RIDGE BEYOND ELEVATION TO BE COLOR '5-3' <br />Boulder County, CO 03684906 <br />it <br />T.O. PARAPET <br />12q'-0" <br />EAVE HEIGHT <br />124'-0" <br />MAIN LEVEL <br />FIN FLR <br />100'-0" <br />SLAB AT <br />LOADING DOG <br />q6-0" <br />5-1 <br />1 ` HIGH BAY WINDOWS <br />\ <br />n <br />B-3 5-2 <br />!pi <br />DRIVE-IN 0.H <br />DOOR <br />SLOPING METAL. ROOF (NO <br />B-2 PARAPET ON BACK SIDE) - <br />auTTE <br />O.H. DOOR O.H. DOOR <br />0.H.DOORS, STAIRS, AND TRASH <br />ENCLOSURE COLOR TO BE P-I <br />5-2 <br />B-1 <br />HORIZONTAL AND VERTICAL <br />REVEALS <br />5-2 <br />PRI <br />METAL. STAIR <br />B-3 <br />5-2 FRONT PARAPET BEYOND B-2 5-2 5-2 5-2 B-2 5-2 5-2 <br />5-1 rt-15-1 <br />f 6r B-I B-I -B-I B-I B-I �— <br />1 <br />o <br />v <br />mu; 1.1,110 11,1 <br />L PRE-GAST TEXTURED GONG. WALL POTENTIAL FUTURE O.H. DOOR, <br />PANELS <br />B-2 <br />7 .1117 7 <br />COLOR NOTES: <br />• SEE GENERAL NOTES ON SHEET 1 FOR COLORS. <br />• PANELS ABOVE WINDOWS AND WINDOW BLOCK OUTS <br />TO RECEIVE ACCENT COLORS AS FOLLOWS: <br />• B-1 AND B-3 BODY AREAS TO RECEIVE B-2 ACCENTS <br />• B-2 BODY AREAS TO RECEIVE B-3 ACCENTS <br />4 NORTH <br />3 SOUTH <br />KEY FLAN <br />NOT TO SCALE: NORTH <br />1 <br />T.O. SCREEN WALL+ <br />116'-0" <br />T.O. SCREEN WALL4 <br />110'-0" <br />LOCATIONS SHOWN DASHED - TYP. <br />TRASH ENCLOSURE <br />PARTIAL ENLARGED EAST ELEVATION (6) <br />SCALE: <br />111--7 <br />I% <br />• <br />• <br />5-2 <br />in"! pi <br />1 <br />--711 <br />Ili <br />B-I <br />1/I 6 " = 1'-0 " <br />LINE OF ROOF EAVE BEHIND <br />PARAPET - TYP. <br />5-3 •1, B-2 <br />WALL 'AG FIxTURE <br />771 <br />`POTENTIAL FUTURE WINDOW <br />LOCATIONS SHOWN DASHED - TYP. REVEALS <br />B-I <br />PRE -CAST TEXTURED CONC. WALL <br />PANELS - TYP. <br />HORIZONTAL AND VERTICAL <br />PARTIAL ENLARGED WEST ELEVATION (5) <br />SCALE: <br />T.O. PARAPET <br />12q'-O" <br />EAVE HEIGHT <br />124'-0" <br />MAIN LEVEL <br />FIN FLR <br />IVV-� <br />HORIZONTAL AND VERTICAL <br />REVEALS r HIGH BAY WINDOWS <br />B-I <br />t <br />GREEN WALL <br />I <br />1 <br />0 <br />NIL iiiith <br />R <br />Er <br />PI <br />WAR- <br />Ill <br />B-3 <br />Min 1 <br />5-2 <br />PRE -CAST TEXTURED GONG. WALL <br />PANELS <br />- <br />1- <br />weal <br />it <br />DECORATIVE CLOSED STEEL -/ <br />CANOPY AT NORTH SIDES AND NE <br />AND NW CORNERS (COLOR P-I) <br />1/16 " = 1'-0 " <br />B-3 <br />B-I <br />J <br />NORTH ELEVATION (4) <br />SCALE: <br />5-2 <br />I/16" = 1'-0" <br />HORIZONTAL AND VERTICAL <br />REVEALS <br />5-2 <br />B-1 <br />PEI <br />-T <br />5-2 <br />11 <br />RECESSED BANDING IN CONCRETE <br />r PANELS - COLOR '5-1' <br />5-2 5-5 <br />i 1 <br />�1 <br />STOREFRONT WINDOWS AND <br />DOORS - TYP. <br />r HIGH BAY WINDOWS <br />B-1 <br />0 ;slim <br />11111111 /11,111 PM Pal PM <br />PECOR AT I VE OPEN 5' I"EEL , .AN 2PY <br />AT SOUTH. EAST AND WEST SIDES <br />AMA.,. <br />(E:+✓LBi: F-I) <br />I I <br />SOUTH ELEVATION (3) <br />SCALE: <br />n <br />Plii <br />1/I 6 " = 1'-0 " <br />EAST ELEVATION (2) <br />SCALE: <br />I" = 50'-0" <br />L PRE -CAST TEXTURED GONG. WALL <br />PANELS <br />rolrr <br />r <br />— _ <br />r.�.rrr <br />/ r <br />�r <br />anelerrrs <br />_ <br />al <br />1. <br />._.. <br />rit-Ili <br />yl <br />T <br />Ail <br />ilk <br />P <br />. <br />.. III <br />.4 <br />Lei ,.. <br />Jr- <br />ii <br />! <br />ale <br />a <br />i•� <br />.a..4... Alb i <br />SW <br />Y - <br />,. JII <br />l <br />WEST ELEVATION (1) <br />\C SCREEN WALL <br />\\ <br />.sire <br />IJIM•III <br />r <br />B-1 <br />T.O. PARAPET <br />12W-0" <br />EAVE HEIGHT <br />124'-0" <br />MAIN LEVEL <br />FIN FLR <br />IVV —V <br />METAL CANOPIES - COLOR 'P-I' <br />T.O. PARAPET <br />12q'-0" <br />EAVE HEIGHT <br />124'-0" <br />MAIN LEVEL <br />FIN FLR <br />�N11 'iIIIIR' <br />sllh',11 1I <br />1 <br />T.O. SCREEN WALL <br />116'-0" <br />T.O. SCREEN WALL <br />110'-0" <br />WEST BUILDING (A) <br />Al c8 <br />L �� <br />N <br />C <br />4 V <br />0 c <br />C <br />(I) <br />Elma <br />a <br />o <br />V 08 <br />Opoi <br />o� <br />NO <br />cO <br />u) <br />FON <br />0 <br />0) <br />w <br />u <br />u <br />2, Replat C <br />• <br />1 <br />O <br />O <br />U <br />PROJ NO: 10-35/17-20 <br />DATE: JUNE 13, 2011 <br />REV: ' JULY 29, 2011 <br />NOV. 9, 2014 <br />/3\ AUGUST 5, 2015 <br />OCT. 15, 2015 <br />A APRIL 13, 2018 <br />A\ JUNE 18, 2018 <br />A AUG. 8, 2018 <br />Copyright cC2018 - All rights <br />reserved RVP Architecture and <br />Consulting, P.C. All design <br />drawings and written material <br />herein may not be used or <br />duplicated without the written <br />consent of RVP Architecture and <br />Consulting, P.C. <br />ELEVATIONS <br />3 <br />SGALE:: <br />SHEET 3 OF 12 <br />