Laserfiche WebLink
Revitalization Commission <br />Minutes <br />October 8, 2018 <br />Page 2 of 2 <br />Motion was made by Menaker, seconded by Lathrop, to approve the 2019 legal <br />contract with Kelly P.C. Motion approved unanimously. <br />• Parking Structure Concept Design Discussion <br />Hoshi Engineer with Desman, reviewed the work to date. The options reviewed <br />again were the E/W basic design and the N/S basic design. Andy Johnson <br />prepared facade concepts for each of those designs. <br />Commissioner thoughts on the E/W orientation were: <br />1) The land swap is not guaranteed, so may not be possible to build should <br />Voltage not move forward <br />2) Lower height is appreciated <br />Commissioner thoughts on the N/S orientation were: <br />1) The height exceeds the transition zone amounts <br />2) Is it possible to go another level underground to help minimize height? <br />3) Is it possible to take the tall part on the north and move it underground? <br />4) North stairwell is tall <br />LRC Members would like to go to City Council for feedback prior to a public open <br />house / forum. <br />Members would like the consultant to create a variation of Option #3 to take some of <br />the 4th level and move to the basement. Also try to relocate the north stairwell away <br />from Front Street to minimize its height. Reduce the overall height of the structure <br />without reducing parking space count. <br />Discussion Items for Tuesday, November 13, 2018 Regular Meeting <br />• Parking structure <br />• DELO Update <br />• 2019 LRC budget <br />Commissioners Comments: <br />None <br />Adjourn: <br />The meeting adjourned at 9:03 am. <br />