My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
City Council Agenda and Packet 2019 02 05
PORTAL
>
CITY COUNCIL RECORDS
>
AGENDAS & PACKETS (45.010)
>
2010-2019 City Council Agendas and Packets
>
2019 City Council Agendas and Packets
>
City Council Agenda and Packet 2019 02 05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 2:12:30 PM
Creation date
2/21/2019 2:03:28 PM
Metadata
Fields
Template:
City Council Records
Doc Type
City Council Packet
Original Hardcopy Storage
9A1
Supplemental fields
Test
CCAGPKT 2019 02 05
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City Council <br />Meeting Minutes <br />January 22, 2019 <br />Page 3 of 16 <br />Dalton noted the LRC has brought forward this conceptual design for discussion of <br />location, size and cost but not design or architecture. The LRC feels increased parking <br />downtown could be a catalyst for development. The LRC believes using tax increment <br />financing could be used to cover a significant amount of building a parking structure. <br />Dalton stated downtown has not seen redevelopment because construction costs are <br />high, lots are small, redevelopment projects that meet zoning are not be large enough to <br />achieve construction efficiencies; two and even three-story developments don't provide <br />return on investment. Properties are difficult to design to meet zoning and parking <br />requirements on site. Of seven projects that have been approved, five have not been <br />completed for some or all of those reasons. Most investment downtown has been the <br />small expansions of existing space that do not trigger parking requirements. Payments of <br />the fee in lieu have not been spent to build parking. Additional supply is one of the few <br />ways to eliminate the neighborhood impacts. If Council determines a parking structure is <br />needed it could be done as part of the eclectic and organic downtown development <br />without conflict with the character. <br />Andy Johnson, 922 Main Street, representing the consulting team of DAJ Design and <br />Desman Design Management, noted these are conceptual and are studies to see what is <br />possible in size, capacity and height within the parameters of this specific site. <br />Johnson reviewed the parking lot in question between Main Street and Front Street. He <br />reviewed design considerations including the alley, utility relocation, the Voltage land <br />swap, the connection between Main and Front, the core and transition area of the <br />downtown design guidelines. He noted they are presenting an east/west option and a <br />north/south option and there are pros and cons of each. <br />East/west design would have a setback from the northern buildings, entry from Front <br />Street, with one floor below grade and three above. It would be a net gain of 277 spaces. <br />All of the heights fall within the downtown design guidelines heights. <br />North/south options 2 and 3. Option 3 has a 26-foot setback from Front and includes an <br />additional 1/2 level below ground. <br />Johnson reviewed the three option comparisons. Option one is the highest cost, option 2 <br />is higher above ground, option 3 raises the cost but has better massing. The team did <br />look at maintenance and operation; they are largely based on the size of the structure <br />with option three having the lowest overall cost in those areas. <br />Councilmember Stolzmann noted the current lot has 101 spaces on it. She asked if more <br />parking could be fit on that lot as it is not optimized. She asked how many more spaces <br />could be added. Johnson stated an estimate would be perhaps 8 additional spaces. <br />
The URL can be used to link to this page
Your browser does not support the video tag.