My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Planning Commission Agenda and Packet 2019 02 14
PORTAL
>
BOARDS COMMISSIONS COMMITTEES RECORDS (20.000)
>
PLANNING COMMISSION
>
2000-2019 Planning Commission
>
2019 Planning Commission Agendas Packets Minutes
>
Planning Commission Agenda and Packet 2019 02 14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 9:55:12 AM
Creation date
2/25/2019 3:28:37 PM
Metadata
Fields
Template:
City Council Records
Doc Type
Boards Commissions Committees Records
Supplemental fields
Test
PCPKT 2019 02 14
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
273
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
January 18, 2019 <br />Rob Zuccaro <br />Planning and Building Safety Director <br />City of Louisville <br />749 Main Street <br />Louisville, CO 80027 <br />Via e-mail: rzuccaro@louisvilleco.gov <br />Mr. Zuccaro: <br />We are committed to completing the Foundry which will become the flagship project of Steel <br />Ranch. The Foundry represents the final phase of the Steel Ranch neighborhood and will <br />become an iconic gateway to the City of Louisville along Highway 42. The overall development <br />plan for the Foundry at Steel Ranch envisions an approximate 14,100 square foot "Foundry" <br />building consisting of retail and restaurant space (including a rooftop deck), 17,800 square feet <br />of in -line commercial/retail space and 32 condominiums inclusive of a landscaped plaza, public <br />and private parking including pedestrian connections throughout the community. <br />The Foundry Final Development Plan / Planned Unit Development (PUD) and final plat were <br />approved by the Louisville City Council on January 19, 2016. Lack of clarity within the resolution <br />of approval (Resolution No. 3, Series 2016) has led to a difference of opinion between City Staff <br />and Foundry Builders regarding the timing of construction. Current market and financing <br />conditions make it impossible to construct both the Foundry commercial building and in -line <br />commercial space (which total approximately 32,000 square feet) prior to completing some or all <br />of the condominiums. In response to these challenges we respectfully request an amendment to <br />the PUD and associated resolution of approval that will provide clarity to the development <br />schedule for both the commercial and residential components of the Foundry project, <br />Our primary concern is the market viability to secure tenants for all 32,000 square feet of <br />commercial space at once. This proposed amendment will allow us to build out the commercial <br />component in a phased approach by commencing with one of the commercial buildings first <br />(prior to or concurrent with the residential condominiums) to be followed by the second <br />commercial building in a later phase as market conditions and financing dictate. As an example, <br />DeLo Plaza, the 14,000 square foot retail center, is still experiencing high retail vacancy since <br />the building was completed in 2017. In addition to existing vacancy at DeLo Plaza, two <br />approved pad commercial buildings have yet to be constructed on site. <br />I2ir9 PEARL STREET. SUITE I4 • BOULDER. (:0 803112 • WV'VG:FOUNl]IZYBU1i t ERS.COM <br />FOUNDRY BUILDERS <br />26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.