My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Sustainability Advisory Board Agenda and Packet 2019 03 20
PORTAL
>
BOARDS COMMISSIONS COMMITTEES RECORDS (20.000)
>
SUSTAINABILITY ADVISORY BOARD
>
2010-2019 Sustainability Advisory Board Agendas and Packets
>
2019 Sustainability Advisory Board Agendas and Packets
>
Sustainability Advisory Board Agenda and Packet 2019 03 20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 10:43:27 AM
Creation date
3/25/2019 10:03:02 AM
Metadata
Fields
Template:
City Council Records
Doc Type
Boards Commissions Committees Records
Supplemental fields
Test
SUSABPKT 2019 03 20
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Water Recommendations <br />Relevant Strategy from 2016 <br />Sustainability Action Plan <br />J.... <br />Stakeholders <br />Timeframe <br />Estimate <br />Funding <br />Key Performance <br />Indicators Addressed , <br />Top <br />Action <br />for <br />2018 & <br />2019 <br />2019 Status <br />u <br />C <br />It <br />Public Works _ <br />px <br />C <br />•E <br />c <br />d <br />City Manager <br />x Econ Dev <br />Library <br />N <br />.' <br />O <br />1 <br />w <br />CCO <br />oi{ <br />Y <br />�6 <br />a <br />Eu <br />E <br />I'O <br />16 <br />CO <br />7u <br />c <br />V <br />x <6 months <br />�n <br />_c <br />C <br />O <br />E <br />aN-I <br />V <br />in <br />_c•� <br />C <br />O <br />E <br />CO <br />-ii <br />V <br /><24 months + <br />auloauo <br />.. <br />3 <br />L <br />C <br />L+ <br />a <br />3 <br />L Reauires add'I budget <br />Grant funds likely <br />r <br />Funding TBD <br />o <br />j <br />N <br />m <br />3 <br />GHG Emissions <br />r <br />s <br />u <br />0 <br />0 <br />H <br />7 <br />ai <br />3 <br />Energy use oer capita <br />H <br />CO <br />ill <br />'V <br />w <br />V <br />of City Fleet using alt fuels <br />City facilities: Energy savings <br />L from upgrades <br />*** <br />Encourage language for quality drought <br />resistant landscaping in the new Design <br />Guidelines. <br />ON HOLD <br />W-IT2S2: "Encourage quality <br />drought resistant landscaping <br />through the development review <br />process." <br />x <br />x <br />x <br />x <br />* * * <br />The Commercial and Industrial Design Guidelines <br />have been put on hold and Planning lead has not <br />yet been identified. Expected to come back <br />online Q2 2019. <br />Conduct a gap analysis for community <br />resources for water efficiency tools, to be <br />maintained annually to identify gaps and <br />inform outreach initiatives. <br />N/A <br />W-ET151: "Conduct a gap <br />analysis for the water efficiency <br />tools, resources and incentives." <br />x <br />x <br />x <br />x <br />x <br />x <br />Not identified as top recommended action in <br />2018/2019 Action Plan and no available status <br />update. <br />Perform an audit on City building <br />plumbing fixtures and determine what <br />replacements may be made to meet or <br />exceed current code. <br />IN PROGRESS <br />W-IT152: "Replace or retrofit city <br />building plumbing fixtures to <br />meet or exceed current code <br />requirements." <br />x <br />x <br />x <br />x <br />Public Works is conducting building audits to be <br />completed by the end of 2019. <br />Plans for a Stormwater Master Plan <br />should be further developed, including a <br />timeline and potential funding source. <br />BEGINNING 2019 <br />W-IT251: "Create a community- <br />wide green infrastructure plan to <br />capture and infiltrate rain water <br />where it falls, thus reducing <br />storm water runoff." <br />x <br />x <br />x <br />x <br />x <br />x <br />x <br />x <br />x <br />x <br />x <br />A Stormwater Master Plan with an emphasis on <br />water quality is currently budgeted for this year. <br />Process of development is slated to begin in <br />2019. Funding has been provided in subsequent <br />years for the implementation of those new <br />projects planned to be identified during the <br />master plan process. <br />
The URL can be used to link to this page
Your browser does not support the video tag.