My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
City Council Agenda and Packet 2019 04 02
PORTAL
>
CITY COUNCIL RECORDS
>
AGENDAS & PACKETS (45.010)
>
2010-2019 City Council Agendas and Packets
>
2019 City Council Agendas and Packets
>
City Council Agenda and Packet 2019 04 02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 2:12:30 PM
Creation date
4/19/2019 11:29:47 AM
Metadata
Fields
Template:
City Council Records
Doc Type
City Council Packet
Original Hardcopy Storage
9A1
Supplemental fields
Test
CCAGPKT 2019 04 02
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
271
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mid -America Pool Renovation, Inc. is fully insured and bondable. We are members <br />of the International Concrete Repair Institute, the Association of Pool & Spa <br />Professionals, the National Plasterers Council, the Waterjet Technology Association, <br />and have an A+ Rating with the Better Business Bureau of Greater Kansas City. <br />We maintain full insurance coverage and have enclosed a sample Certificate of <br />Insurance in this Booklet, and enforce a drug -free workplace. <br />A partial list of our Key Personnel is also included in this booklet. We do not Sub - <br />Contract out the Work. <br />Summary of Work in the order of Work Activities on -site <br />Draining of the Pool <br />Removal of existing Hydro -static Relief Valves <br />Manual removal of the existing PVC Liner <br />- 40,000 psi Water Jetting of the entire surface to remove remaining felt, all <br />loose or hollow materials and produce a sub -surface for a strong <br />mechanical Bond for the new surfacing material <br />Manual chipping to remove all existing tiling <br />Manual cleaning of debris <br />- 4,000 psi water blasting to clean the surface — allow to dry <br />- Remove all debris off site <br />- Install new water line tiling (Laticrete Tile setting materials) <br />Install new racing lane and target tiling (Laticrete Tile setting materials) <br />- Install new Cement -based pool plaster (Pumped in, hand troweled until dry <br />& smooth (Pool Plaster or Diamond Brite®) <br />- Install new hydro -static relief valves and drain covers <br />- Inspect the Work with the designated City Representative <br />- Punch List — as / if needed <br />Remove debris, excess material off site <br />Begin filling — continuous filling until full <br />Submit the Care & Maintenance Sheet (one to the City Representative, a <br />Laminated Sheet to hang in the pool equipment Room) <br />- Startup / Training of Pool Care Staff <br />- Anticipated Amount of Work Days (11 -13, weather providing) <br />Work could be performed during the April / May desired timeframe, however pending <br />Scheduling because of harsh seasonal weather. <br />Please let us know if you have any questions. <br />Sincere! , <br />s <br />David E. Kateusz <br />Managing Director <br />Mid -America Pool Renovation, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.