Laserfiche WebLink
SUBJECT: TRANSPORTATION MASTER PLAN PRELIMINARY PROJECT LIST <br />DATE: MARCH 28, 2019 <br />PAGE 4 OF 5 <br />TMP Funding Scenarios: <br />Three funding scenarios have been included in the spreadsheet to understand what the <br />City could accomplish depending on what funding is dedicated to TMP implementation. <br />This is intended as an exercise to aid in discussion is not intended to lead to final <br />determinations on project prioritization or funding options. The three scenarios outline <br />what projects could be funded through a Current State, Expanded Investment state, and <br />Enhanced Funding state. The scenarios show short to medium term funding over a <br />period of 6 years. Since this is a 20-year plan, consideration can be giving to longer <br />term funding scenarios, but for the purpose of this preliminary review we are focusing <br />on our typical 6-year CIP cycle. The funding scenarios were derived using the following <br />assumptions: <br />Current State: This funding scenario assumes the City will include in its budget $1.5 <br />million each year for 6 years. This was based on the current CIP budget plans, under <br />which the City has provided similar funding ($8 million over 6 years) to help support the <br />implementation of the TMP. In addition, this reflects a similar level of investment that the <br />City has made over the past few years for transportation improvement projects <br />(excluding paving) such as Railroad Quiet Zones, SH 42 underpass, studies, <br />neighborhood traffic safety, etc. This reflects funding that may or may not include some <br />small portion of grant funding and partner agency funding. <br />Expanded Investment: This scenario includes an annual budget appropriation of $3 <br />million, or $18 million over 6 years. This would most likely require an increased <br />investment by the City (over current investment levels), and/or the possibility of <br />significant grant or outside funding to expedite project implementation. <br />Enhanced Funding: This scenario includes an annual budget of $5 million per year, or <br />$30 million over 6 years. It represents a continued City investment at the current level, <br />and a significant investment in transportation that would likely occur through a state, <br />regional or local ballot issue, fee, tax or other new funding source. Under this scenario, <br />there could be the possibility of bonding to provide for an up -front investment in <br />transportation. Staff have not conducted the payback analysis on a potential bond at <br />this time. <br />Maintenance/Operational Costs: The maintenance costs of many projects would be <br />minimal, but for other projects there could be increased operational costs either at the <br />front end of the project (for engineering, project management, etc.) or for maintenance <br />of the facility once constructed. This estimate could fluctuate over time, but represents <br />the need for a concurrent operational investment to ensure these needs can be <br />adequately addressed. <br />CITY COUNCIL COMMUNICATION <br />