Laserfiche WebLink
The design build team is currently working on detailed cost estimates for the project. Staff will <br />continue to work with the design build team to evaluate costs to ensure that they are aligned with the <br />overall project objectives. Based on the needs of replacing irrigation infrastructure on medians it <br />might be necessary to accelerate some of the 2021 funding into 2020. <br />Next Steps: <br />• Continue working closely with staff to define current conditions. <br />• Continue working with staff to define a tree management and mitigation strategy. <br />• Coordinate with Public Works. <br />• Continue to refine design concepts. <br />• Continue work on construction documents and detailed cost estimates. <br />• Begin demolition followed by construction. <br />• Page 2 <br />5 <br />