CIP UPDATE 9‐13‐19 <br />PROJECTS BUDGET STATUS <br />WATER <br />Replace Tube Settlers $380,746  Complete <br />Raw Water Line Lowering $3,000 Complete <br />WTP Boat and Trailer $25,000  Complete <br />Water Utility Truck $80,000  Complete <br />HBWTP Upgrades $197,220  Complete <br />SCWTP Upgrades $27,770  Complete, processing final payment <br />Watershed Protection Plan $10,000  Plan complete, BMP implementation  <br />Water Plants Disinfection $407,621  Contract Approval to Council 9/17, consutrction into 2020 <br />Howard Diversion $128,700  Design, construction this Winter <br />System Water Loss Audit $42,000  Finalizing report <br />2019 Waterline $1,844,000  Construction, 85% complete <br />SCWTP Building Upgrades $523,000  Design, bid this Fall <br />SBR Ditch Lining $170,200  Delayed until 2020 <br />SCWTP Lower Recycle Pond  $86,000  Design, construction budget not defined <br />Water Tank Maintenance $92,600  Bidding next month for Fall construction <br />Louisville Pipeline Flow Control $419,355  Permitting, construction Oct‐Nov <br />Hi Zone Water Loop $42,230  Reimbursement for developer performed work <br />NCWCD‐Windy Gap Firming Project $2,500,000  Bidding, remaining payment in 2020 <br />NCWCD‐SWSP Eastern Pump Station $93,000  Delayed until 2020 <br />SWSP Transmission Capacity $287,000  Design, bid EOY for construction 2020 <br />Vehicle & Equipment Replacement $190,500  One vehicle remaining <br />PRV Replacement $75,000  Delayed until 2020 <br />Fluoride Equipment Replacement $105,000  Design award <br />Excavation Shoring Box $9,000  Obtaining quotes <br />Barricades and Trailer $5,000  Obtaining quotes <br />Meter Pilot Programs $168,000  Program implementation <br />Fire Hydrant Painting $44,690  In process, 70% complete <br />SCADA $36,000  In process, 60% complete <br />Utility Trailer $4,650  Obtaining quotes <br />WASTEWATER <br />Asphalt Addition $50,000  Complete <br />2018 Sewer Line Replacement $1,034,070  Punchlist, legal action <br />Local Limits $25,000  Design <br />Steel Ranch Lift Station $50,000  Evaluation process <br />2019 Sewer Utility Line Replacement $498,000  Construction, 90% complete <br />Sewer Video $100,000  Construction, 70% complete <br />Reuse System Equipment Replacement $32,000  Construction, 50% complete <br />Vehicle & Equipment Replacement $62,000  Obtaining quotes <br />Vibration Monitoring $40,000  Rebidding, possible delay <br />Digester Control Improvements $100,000  Rebidding, possible delay <br />Sanitary Sewer Maintenance Equipment $260,000  Contract Approval to Council 9/17 <br />Influent Pump Addition $72,000  Contract award, delayed to align with Aeration Basin project <br />Digester and Reuse Lighting Improvements $40,000  Rebidding, possible delay <br />Aeration Basin and Reuse mixers $150,000  Rebidding <br />TSS Probes $45,000  Rebidding, possible delay <br />Vac Dump Station $235,000  Rebidding, possible delay <br />Excavation Shoring Box $3,000  Obtaining quotes <br />Portable Lift Station Pump $50,000  Obtaining quotes <br />Barricades and Trailer $5,000  Obtaining quotes <br />Utility Trailer $4,650  Obtaining quotes <br />STORM <br />Snow Plow/Dump Truck Replacement $56,000  Complete <br />Detention Pond Maintenance $121,500  In process <br />Drainageway G $150,000  Incorporated with RxR Quiet Zones and area development <br />Stormwater Quality Masterplan $100,000  Design <br />Utility Trailer $4,650  Obtaining quotes <br />19