My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 2019-48
PORTAL
>
CITY COUNCIL RECORDS
>
RESOLUTIONS (45.160)
>
2010-2019 Resolutions
>
2019 Resolutions
>
Resolution 2019-48
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2024 3:11:34 PM
Creation date
11/20/2019 10:40:01 AM
Metadata
Fields
Template:
City Council Records
Doc Type
Resolution
Ord/Res - Year
2019
Ord/Res - Number
48
Original Hardcopy Storage
9C5
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXHIBIT A <br />DESCIPTION OF THE WORK <br />The Work associated with this Third Interim Agreement includes the following: <br />• Construction of the Eastern Pump Station will consist primarily of construction of a <br />booster pump station on the existing Fort Lupton/ Hudson Pipeline. The pump station <br />will consist of a new 5,200 square foot metal building with concrete foundation. The <br />pump station will house five new vertical turbine pumps to be installed in below grade <br />cans, each with 700 horsepower motors powered by adjustable frequency drives (AFDs) <br />powered by 4,160 kV power. Other appurtenances and work includes: relocation of the <br />existing 30-inch diameter steel pipe within the pump station property, construction of a <br />new check valve vault, flow meter vault, and isolation valve vaults, and site work <br />including new fencing, paving, and a septic leach field. <br />• Electrical system improvements required by United Power to supply power to the Eastern <br />Pump Station Site. <br />• Project review and oversight including engineering review, construction management, <br />construction testing, administration, permitting, and inspection services. <br />• Temporary easement procurement and any necessary right-of-way work. <br />• Legal assistance, as required. <br />
The URL can be used to link to this page
Your browser does not support the video tag.