Laserfiche WebLink
1111111111111 <br />ui <br />11104 2019 02:44 PM <br />Boulder County Clerk, CO <br />ENT <br />COLUMNS <br />51 <br />03746761 <br />Page: 1 of 2 <br />DF: $0.00 <br />ENTRY LEFT SIDE <br />ENTRY SIDE DETAIL <br />P2 <br />2X6 STUCCO <br />POP OUT <br />6 STUCCO <br />POP OUT <br />Centennial Valley <br />Parcel H Hampton Inn <br />Administrative PUD Amendment No. 2 <br />EXISTING SIGNAGE TO BE <br />REMOVED, SALVAGED, AND <br />REINSTALLED AFTER PAINTING IS <br />COMPLETED. <br /><P2� <br />2X6 STUCCO <br />POP OUT <br />WEST ELEVATION <br />1 /8", = 1 "-e" <br />COLUMNS 6" STUCCO <br />ENTRY <br />POP OUT <br />ENTRY RIGHT SIDE <br />6'" STUCCO <br />POP OUT <br />STUCCO DETAIL <br />8" STUCCO <br />BAND <br />(P2) <br />2X6 STUCCO <br />f POP OUT <br />� P2 <br />�P_2) <br />WINDOW GRILL <br />AND FRAME <br />UJINDOUJ DETAIL <br />INSPECT AND REPAINT EXISTING <br />LOUVERS DARK BRONZE MATCHING <br />EXISTING WINDOWS WHERE NECESSARY <br />P3� <br />8" STUCCO <br />BAND <br />EXISTING WINDOWS TO <br />REMAIN <br />PUD AMENDMENT SCOPE OF WORK <br />EXISTING <br />ROOF <br />(P1) <br />/- P2 <br />INSTALL 6" WIDE X <br />2" DEEP STUCCO <br />TRIM DETAIL <br />VERTICALLY NEXT <br />TO WINDOWS TYP. <br />7-CP3� <br />INSTALL 6 STUCCO POPOUT OVER <br />EXISTING STUCCO WALL AROUND <br />PERIMETER AS SHOWN <br />MATERIALS AND COLOR PALETTE <br />SCOPE OF WORK INCLUDES COSMETIC FACADE <br />IMPROVEMENTS TO ALL EXTERIOR ELEVATIONS AS <br />FOLLOWS: <br />1) ADDITION OF SYNTHETIC STONE VENEER FINISH <br />OVER EXISTING WALL AT LOCATIONS SHOWN ON <br />ELEVATIONS. <br />2) ADDITION OF STUCCO DETAILS AND POPOUTS <br />FRAMING EXISTING WINDOW OPENINGS. <br />3) REPAINTING THE EXTERIOR WITH NEW COLORS <br />AS SHOWN. <br />NOTES: <br />NO ALTERATION WORK IS PROPOSED TO ANY <br />EXISTING OPENINGS. EXISTING SIGNAGE AND ROOF <br />COVERING TO REMAIN. REMOVE SIGNAGE <br />TEMPORARILY TO REPAINT. <br />DIRECTOR OF PLANNING AND BUILDING SAFETY CERTIFICATE <br />APPROVED THIS DAY OF/ 4, 20Zi BY THE <br />DIRECTOR OF PLANNING AND BUILDING SAFETY OF THE CITY <br />OF LOUISVILLE, COLORADO. <br />DIRECTOR OF PLANNING AND BUILDING SAFETY <br />CLERK AND RECORDER CERTIFICATE <br />I HEREBY CERTIFY THAT THIS INSTRUMENT WAS FILED IN MY <br />OFFICE AT O'CLOCK , THIS DAY OF <br />, 20 , AND IS RECORDED IN THE PLAN FILE <br />, FEE PAID FILM NO. <br />RECEPTION <br />BY: <br />BY: <br />CLERK AND RECORDER <br />DEPUTY <br />MIN <br />51 <br />SYNTHETIC STONE VENEER <br />MANUFACTURER ELDORADO STONE <br />TYPE: STACKED STONE <br />COLOR CHAPEL HILL <br />—BODY COLOR 1 <br />P1 MANUFACTURER BENJAMIN MOORE <br />COLOR ANTIQUE PARCHMENT 959 <br />—BODY COLOR 2 <br />P2 MANUFACTURER BENJAMIN MOORE <br />COLOR: CHINA WHITE OC-141 <br />—TRIM COLOR <br />P3 MANUFACTURER BENJAMIN MOORE <br />COLOR GALVESTON GRAY AC-21 <br />—ACCENT COLOR <br />P4 MANUFACTURER BENJAMIN MOORE <br />COLOR WILLOW CC-542 <br />SIMILAR TO "LIGHT TO MEDIUM PALETTE!' <br />PER HILTON FYI EXTERIOR GUIDE - JUNE 2014 <br />0 <br />1 <br />1 <br />1 <br />key plan <br />OWNERSHIP SIGNATURE BLOCK <br />WITNESS OUR HANDS AND SEAL THIS fl‘ Sk. DAY OF <br />„No‘e20 at <br />BY: <br />ST <br />NOTARY: <br />GE COMPANIES <br />Notary Public <br />State of Colorado <br />Notary ID # 20024029142 <br />My Commission Expires 09-16-2022 <br />MY COMMISSION EXPIRES: P ct !3- <br />COMMUNICATION IS <br />© 201S KENNEY LEE ARCHITECTURE GROUP, INC. <br />a) <br />a) <br />C <br />■ <br />■ ■ <br />co <br />0 <br />0 <br />0 <br />C <br />a) <br />E <br />a) — a) <br />cc; o <br />> � <br />— N <br />E _ 0 <br />_w _ > <br />_ t <br />a) <br />0 <br />co <br />L <br />0 <br />0 <br />• <br />c <br />co <br />0 <br />J <br />I I I I I I I I <br />J <br />sheet <br />Al <br />of 2 <br />