My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Planning Commission Agenda and Packet 2008 09 11
PORTAL
>
BOARDS COMMISSIONS COMMITTEES RECORDS (20.000)
>
PLANNING COMMISSION
>
2000-2019 Planning Commission
>
2008 Planning Commission Agendas and Minutes
>
Planning Commission Agenda and Packet 2008 09 11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 9:32:24 AM
Creation date
3/25/2020 3:05:07 PM
Metadata
Fields
Template:
City Council Records
Doc Type
Boards Commissions Committees Records
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
180
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
fT <br />• 130'-0" <br />T.O. PARAPET <br />• /25-O" <br />T B.O. STRICT <br />• 118'-O" <br />T.O. CATWALK <br />SMOOTH -FACED CHU <br />SPLIT -FACED GMU <br />135-0" <br />T.O. MEGH SCREEN <br />n n <br />• <br />• <br />MECHANICAL SCREEN, PTD. MECHANICAL SCREEN, PTV. <br />STUCCO STUCCO <br />RECLAIMED TIMBER CANOPY RECLAIMED TIMBER CANOPY <br />130'-0" 4, 130'-O" <br />T.O. PARAPET T.O. PARAPET <br />126'-0" <br />B.O. STRUCT <br />$ <br />126'-0" <br />B.O. STRUCT <br />STOREFRONT STOREFRONT <br />TIMBER $ IRON RAILING TIMBER $ IRON RAILING <br />112'-O" <br />FIN FL. <br />T.O. SLAB 114'-O" <br />4, 112'-O" <br />B.O. STRUT <br />STOREFRONT STOREFRONT <br />$ <br />126'-0° 100'-0"" <br />ArJ TRIYT Tr) SI AR <br />SMOOTH -FACED GMU <br />SPLIT -FACED GMU <br />• 130'-0" <br />T.O. PARAPET <br />• 126'-0" <br />T B.O. STRUCT <br />VJEST ELEVATION <br />SCALE: 1/8"=1'-0" <br />MECHANICAL SCREEN, PTV. <br />OPERABLE WINDOWS <br />PAINTED METAL DOORS <br />135'-0" <br />T.O. MEGH SCREEN <br />0 <br />CONCRETE PANEL BOARD <br />T100'-O" <br />T.O. SLAB <br />MECHANICAL SCREEN, PTV. <br />SMOOTH -FACED GMU <br />SPLIT -FACED GMU <br />T130'-0" <br />T.O. PARAPET <br />126'-0" <br />T B.O. STRUCT <br />114'-0" T.O. SLAB <br />112'-0" <br />T B.O. STRUCT <br />• 100'-O" 100'-O <br />T.O. SLAB T T.O. SLAB <br />3 I EAST ELEVATION <br />SCALE. 1/8 -1-0 <br />135'-0" <br />T.O. MEGH SCREEN <br />II <br />LI <br />II <br />y <br />o <br />2 I SOUTH ELEVATION <br />SCALE: 1/8"=1'-0" <br />4 I NORTH ELEVATION <br />SCALE. 1/8 -1-0 <br />135'-0" <br />T.O. MEGH SCREEN <br />130'-O" di <br />T.O. PARAPET <br />125' <br />B.P 5 <br />IP <br />II; -0" <br />.0.CAILK <br />126'-0" ji <br />B.O. STRUGT <br />studies <br />ARCH TECTURE <br />303 - 323 -1923 <br />BOULDER, COLORADO <br />LILA <br />LILA <br />IIII I I I ❑PU••1' <br />REV. DATE: <br />1: 8-25-08 <br />issuance : <br />PERMIT SET <br />GAIAM <br />DATE: 8-25-08 <br />A-3. 1 <br />o <br />2 I SOUTH ELEVATION <br />SCALE: 1/8"=1'-0" <br />4 I NORTH ELEVATION <br />SCALE. 1/8 -1-0 <br />135'-0" <br />T.O. MEGH SCREEN <br />130'-O" di <br />T.O. PARAPET <br />125' <br />B.P 5 <br />IP <br />II; -0" <br />.0.CAILK <br />126'-0" ji <br />B.O. STRUGT <br />studies <br />ARCH TECTURE <br />303 - 323 -1923 <br />BOULDER, COLORADO <br />LILA <br />LILA <br />IIII I I I ❑PU••1' <br />REV. DATE: <br />1: 8-25-08 <br />issuance : <br />PERMIT SET <br />GAIAM <br />DATE: 8-25-08 <br />A-3. 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.