Laserfiche WebLink
2020 Transportation Master Plan budget expenses <br />2020 budget (includes <br />20% contingency) <br />SBR at Grade Safety Improvements <br />$270,000 <br />SH 42 Conceptual Design Plan <br />$90,000 <br />104th Street Regional Trail Connection <br />$62,500 <br />SH 42 Engineering Design for specific segments of <br />the project <br />$600,000 <br />Pine Street Improvements <br />$1,426,055 <br />Sidewalk construction on SH 42 from South to Pine St <br />$700,000 <br />Formalization of bump -outs at key locations <br />$275,000 <br />$3,423,555 <br />