Laserfiche WebLink
2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 <br />WATER 0%1.5% 1.8% 1.8% 1.8% 1.8% 1.9% 1.9% 2.0% 2.0% 2.0% <br />SEWER 0%4.5% 4.5% 4.5% 4.0% 4.0% 4.5% 4.5% 4.0% 4.0% 4.0% <br />STORM 0%14.0% 5.0% 4.5% 4.0% 4.0% 4.0% 0.8% 0.8% 0.8% 0.8% <br />WATER 4.0% 4.5% 4.5% 4.0% 1.8% 1.9% 1.9% 2.0% 2.0% 2.0% <br />Change 2.5% 2.7% 2.7% 2.2%------ <br />SEWER 4.5% 4.5% 4.5% 4.5% 4.5% 5.0% 4.5% 4.0% 4.0% 4.0% <br />Change - - - 0.5% 0.5% 0.5%---- <br />STORM 14.0% 5.0% 4.5% 4.0% 8.5% 8.5% 3.0% 0.8% 0.8% 0.8% <br />Change ----4.5% 4.5% 2.2% - - - <br />WATER 5.0% 5.0% 5.0% 5.0% 1.8% 1.9% 1.9% 2.0% 2.0% 2.0% <br />Change 3.5% 3.2% 3.2% 3.2%------ <br />SEWER 4.5% 4.5% 4.5% 5.0% 5.0% 5.0% 5.0% 4.5% 4.0% 4.0% <br />Change 0.0% 0.0% 0.0% 1.0% 1.0% 0.5% 0.5% 0.5% - - <br />STORM <br />WATER 3.0% 3.0% 3.5% 3.0% 3.0% 1.9% 1.9% 2.0% 2.0% 2.0% <br />Change 1.5% 1.2% 1.7% 1.2% 1.2%----- <br />OPTION A ‐ Reduced Tap Fees ‐ New CIPs only <br />2020 Rates (Approved 03/03 Council Meeting and Frozen at 04/07 Council Meeting) <br />ASSUMPTIONS: <br />● No Tap Fees for Three Model Years: 2021, 2022 & 2023 (actual years: 2020‐$2.2M, 2021‐$2.6M & 2022‐ <br />● Full funding for 2021‐2026 CIP Requests <br />● No Cash Payment for Windy Gap (removed $2.5 million) <br />● Delay both Meter Replacement and Lateral Piping CIPs by 2 years <br />OPTION B ‐ Option A including Projected Overages <br />● Excludes Overage Capital Projects (6 projects at $2.8M) <br />● Reduce the first 2‐years of water rights purchases in half and extend 1‐year to 2027 <br />UTILITY RATE INCREASE OPTIONS <br />ASSUMPTIONS: <br />● Same as Option B <br />● $5M Water Bond in 2021 for both SWSP and Lateral Pipelines <br />● Delayed projects limited to Meter Replacement <br />OPTION C ‐ Option B with Water Bond <br />● Reduce the first 4‐years of water rights purchases in half and extend 2‐year to 2028 <br />● Includes Overage Capital Projects (6 projects at $2.8M) <br />No Change for Opt A <br />ASSUMPTIONS: <br />● Same as Option A <br />● Delay Lateral Piping by additional 2 years and Harper Pump Station by 5 years <br />BASED ON IDENTIFIED REDUCED TAP FEES FROM COVID‐19 IMPACTS <br />15