My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Utility Committee Agenda and Packet 2020 05 12
PORTAL
>
BOARDS COMMISSIONS COMMITTEES RECORDS (20.000)
>
UTILITY COMMITTEE (pka: Water Committee)
>
2020 Utility Committee Agendas and Packets
>
Utility Committee Agenda and Packet 2020 05 12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2020 8:44:00 AM
Creation date
5/15/2020 10:58:48 AM
Metadata
Fields
Template:
City Council Records
Meeting Date
5/12/2020
Doc Type
Boards Commissions Committees Records
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Cent/McCaslin Hi Zone Water Lp <br />Wateer <br />$ 22,230 <br />Louisville Pipeline Flow Control <br />Wat <br />$ 130,010 <br />a. <br />Meter replacement <br />Water <br />$ 44,280 <br />$ 989,000 <br />$ 965,000 <br />Raw Water Quality Study <br />Water <br />$ 75,000 <br />Raw Water Valve <br />Water <br />$ 35,000 <br />HBWTP Drying Bed <br />Water <br />$ 200,000 <br />Utility Master Plan <br />Water/Sewers <br />$ 250,000 <br />Chemical Mixing Tanks <br />Water <br />$ 32,000 <br />Machinery & Equip <br />Water <br />$ 4,600 <br />Reuse System Equipment Replacement <br />Sewer <br />$ 98,000 <br />Vehicle & Equipment Replacement <br />Sewer <br />$ 57,000 <br />$ 50,000 <br />Lift Station Painting <br />Sewer <br />$ 75,000 <br />TSS Probes & 2nd Treatment Probes <br />Sewer <br />$ 45,000 <br />$ 105,000 <br />Trailers <br />Sewer <br />$ 4,600 <br />III <br />Asphalt <br />Sewer <br />$ 20,000 <br />i <br />i <br />ga <br />i <br />Drainageway 7-1 <br />Storm <br />$ 500,000 <br />Stormwater Quality Master Plan <br />Storm <br />$ 191,420 <br />$ 100,000 <br />$ 100,000 <br />$ 100,000 <br />$ 100,000 <br />$ 100,000 <br />$ 100,000 <br />Utility Trailer <br />Storm <br />$ 1,570 <br />A <br />r <br />Stormwater Improvement Master Plan <br />Storm <br />$ 120,000 <br />Delayable Projects <br />Lateral Ditch Piping <br />Water <br />$ 2,536,000 <br />Howard Diversion Completion/Upkeep <br />Water <br />$ 125,830 <br />Lower Recycle Pond SCWTP <br />Water <br />$ 29,000 <br />Lower Recycle Pond SCWTP <br />Water <br />$ 676,000 <br />SCWTP Building Upgrades <br />Water <br />$ 75,000 <br />Fluoride Equipment Replacement <br />Water <br />$ 92,947 <br />Fluoride Equipment Replacement <br />Water <br />$ 234,000 <br />Harper Pump Station Rehab <br />Water <br />$ 95,000 <br />$ 481,000 <br />22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.