Laserfiche WebLink
Cent/McCaslin Hi Zone Water Lp <br />Wateer <br />$ 22,230 <br />Louisville Pipeline Flow Control <br />Wat <br />$ 130,010 <br />a. <br />Meter replacement <br />Water <br />$ 44,280 <br />$ 989,000 <br />$ 965,000 <br />Raw Water Quality Study <br />Water <br />$ 75,000 <br />Raw Water Valve <br />Water <br />$ 35,000 <br />HBWTP Drying Bed <br />Water <br />$ 200,000 <br />Utility Master Plan <br />Water/Sewers <br />$ 250,000 <br />Chemical Mixing Tanks <br />Water <br />$ 32,000 <br />Machinery & Equip <br />Water <br />$ 4,600 <br />Reuse System Equipment Replacement <br />Sewer <br />$ 98,000 <br />Vehicle & Equipment Replacement <br />Sewer <br />$ 57,000 <br />$ 50,000 <br />Lift Station Painting <br />Sewer <br />$ 75,000 <br />TSS Probes & 2nd Treatment Probes <br />Sewer <br />$ 45,000 <br />$ 105,000 <br />Trailers <br />Sewer <br />$ 4,600 <br />III <br />Asphalt <br />Sewer <br />$ 20,000 <br />i <br />i <br />ga <br />i <br />Drainageway 7-1 <br />Storm <br />$ 500,000 <br />Stormwater Quality Master Plan <br />Storm <br />$ 191,420 <br />$ 100,000 <br />$ 100,000 <br />$ 100,000 <br />$ 100,000 <br />$ 100,000 <br />$ 100,000 <br />Utility Trailer <br />Storm <br />$ 1,570 <br />A <br />r <br />Stormwater Improvement Master Plan <br />Storm <br />$ 120,000 <br />Delayable Projects <br />Lateral Ditch Piping <br />Water <br />$ 2,536,000 <br />Howard Diversion Completion/Upkeep <br />Water <br />$ 125,830 <br />Lower Recycle Pond SCWTP <br />Water <br />$ 29,000 <br />Lower Recycle Pond SCWTP <br />Water <br />$ 676,000 <br />SCWTP Building Upgrades <br />Water <br />$ 75,000 <br />Fluoride Equipment Replacement <br />Water <br />$ 92,947 <br />Fluoride Equipment Replacement <br />Water <br />$ 234,000 <br />Harper Pump Station Rehab <br />Water <br />$ 95,000 <br />$ 481,000 <br />22 <br />