My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Planning Commission Agenda and Packet 2020 06 11
PORTAL
>
BOARDS COMMISSIONS COMMITTEES RECORDS (20.000)
>
PLANNING COMMISSION
>
2020 Planning Commission Agendas Packets Minutes
>
Planning Commission Agenda and Packet 2020 06 11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2020 2:34:56 PM
Creation date
6/12/2020 8:41:09 AM
Metadata
Fields
Template:
City Council Records
Meeting Date
6/11/2020
Doc Type
Boards Commissions Committees Records
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1445
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Figure 5: Conceptual layout for height and density modeling <br />CURRENT CONCEPTUAL SITE PLAN <br />Program Summary* <br />=()FFIC-0 <br />7,26d WO SF <br />MSerdcK I'Lving <br />1.800.000 SF <br />1111111111134will <br />200,000 SJ; <br />=Retail <br />70,004 SF <br />M qesidewwl <br />9M.000 S F <br />Fora 1 beam ParKrng 5,220, 000 SF <br />•r,MAIL mgnt mAdmvW <br />1nCa. EjMtVrMR1B*KVW <br />U:RAFY: Ft# F uF NOKiN4 <br />_7jAKIM <br />Anticipated heights under the GDP range up to five stories, with most five story <br />development limited to 75 ft. For the Medtronic Campus on Parcel B, the anticipated <br />height is 90 ft. at five stories. The height plan has shorter buildings on the west side of <br />the development, starting at two and three stories, and transitioning to taller buildings to <br />the east. Similarly, the north side of the development includes restrictions for three <br />story development and transitions to taller buildings to the south. The southern <br />periphery of Parcel C also has a limitation to 3 stories. Topography varies significantly <br />through the property, but generally gains elevation from east to west, with an <br />approximate difference of 120 ft. in elevation. There is a large berm on the southwest <br />side of proposed Parcel D that partially buffers buildings in this location from view to the <br />south and from US 36. A large portion of the property in the south-central part of the <br />development is relatively flat, where over lot grading was completed for the former <br />StorageTek campus development. <br />Redtail Ridge Comprehensive Plan and GDP Amendments <br />PC — June 11, 2020 <br />Page 9 of 32 <br />W. <br />
The URL can be used to link to this page
Your browser does not support the video tag.