Laserfiche WebLink
Planning Commission <br />Meeting Minutes <br />October 8, 2015 <br />Page 13 of 23 <br />Closed Public Hearing and discussion by Commission: <br />Rice says I am interested in the procedure. It is a little bit unorthodox but I think everybody <br />seems comfortable with it. I know Staff believes that this gives flexibility. I think it is fine. Other <br />than that, I think it is a great project, whichever one it is that we end up with. I am really excited <br />about all the activity out at the CTC. This is fantastic. To see this kind of economic vibrancy in <br />the City is very important. I applaud your efforts in that regard. <br />Brauneis says I am in favor of the projects and look forward to further detail down the line. <br />Moline says I am in support. <br />Pritchard says that I am in support. I agree that the flexibility on a project of this size is needed. <br />I think it is beneficial that Staff was able to look at it and present it both ways. I would suggest <br />that Staff be prepared to give examples of where we have done this before. I assume City <br />Council will ask the exact same question. <br />Motion made by Brauneis to approve Resolution No. 31, Series 2015, seconded by Moline. <br />Roll call vote. <br />Name <br />Vote <br />Chris Pritchard <br />Yes <br />Jeff Moline <br />Yes <br />Ann O'Connell <br />n/a <br />Cary Ten ler <br />n/a <br />Steve Brauneis <br />Yes <br />Scott Russell <br />n/a <br />Tom Rice <br />Yes <br />I <br />Motion passed/failed: <br />Pass <br />Motion passes 4-0. <br />➢ Climbing Gym/Brew Pub - Resolution 32, Series 2015: A resolution recommending <br />approval of a final planned unit development (PUD) plan and special review use (SRU) <br />to allow for the construction of a 24,282 SF climbing gym and 4,071 SF brewpub in the <br />Colorado Technology Center. <br />• Applicant and Representative: DAJ Architects <br />• Owner: TEBO Properties <br />• Case Manager: Lauren Trice, Planner I <br />Conflict of Interest and Disclosure: <br />None. <br />Public Notice Certification: <br />Published in the Boulder Daily Camera on September 20, 2015. Posted in City Hall, Public <br />Library, Recreation Center, and the Courts and Police Building and mailed to surrounding <br />property owners and property posted on September 18, 2015. <br />Staff Report of Facts and Issues: <br />Trice presented from Power Point: <br />• Property located at the corner of Cherry and Dogwood and zoned Industrial (1). A PUD <br />and SRU are required for this project. <br />• The Climbing Gym is being classified as a Public/Private School and is 24,282 SF. <br />• The Brew Pub is classified as an indoor eating/drinking establishment and is 4,407 SF. <br />• Landscaping coverage on the site plan exceeds 25% minimum and the site meets all <br />setback requirements. <br />