My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Planning Commission Minutes 2017 02 09
PORTAL
>
BOARDS COMMISSIONS COMMITTEES RECORDS (20.000)
>
PLANNING COMMISSION
>
2000-2019 Planning Commission
>
2017 Planning Commission Agendas Packets Minutes
>
Planning Commission Minutes 2017 02 09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2020 1:29:36 PM
Creation date
7/9/2020 11:46:05 AM
Metadata
Fields
Template:
City Council Records
Meeting Date
2/9/2017
Doc Type
Boards Commissions Committees Records
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Planning Commission <br />Meeting Minutes <br />February 9, 2017 <br />Page 2 of 14 <br />Published in the Boulder Daily Camera on January 22, 2017. Posted in City Hall, Public Library, <br />Recreation Center, and the Courts and Police Building and mailed to surrounding property <br />owners and property posted on January 20, 2017. <br />Staff Report of Facts and Issues: <br />Dean presented from Power Point: <br />• Located at Dogwood and Cherry in the CTC <br />• 3.64 acres <br />• Zoned Industrial <br />• Propose to build 40,383 SF Flex building <br />• Complies with IDDSG <br />• Site Coverage = 74.1 % <br />• Hardscape = 48.3% <br />• Building = 25.8% <br />• Building Setbacks <br />o Front = 30 feet <br />o Side = 10 feet <br />o Rear = 15 feet <br />• IDDSG - PARKING <br />o Flex Buildings <br />o Minimal 2 spaces/1,000 sf <br />o Phased Parking Plan <br />o Phase I will have 87 spaces, 2.13 spaces/1,000 sf <br />o Phase II = up to 44 spaces <br />■ Truck circulation initially, then at Phase II build out, circulation and parking <br />o Total of 133 spaces, 3.21 spaces/1,000 sf <br />o IDDSG allow parking to be deferred, also included on plans <br />o Phase II parking asking for waiver from landscape islands <br />o Phase II may include loading docks or parking spaces depending on tenants <br />o There are landscape islands in Phase I parking <br />o Landscaping more concentrated on southern edge of site <br />• ACCESS AND CIRCULATION <br />o Two accesses, northern and southern <br />o Pedestrian circulation <br />o Two bike racks proposed <br />o Employee break area, located at southern end <br />o Existing sidewalk along Dogwood <br />o Condition <br />o Easement for maintenance of the sidewalk where it crosses onto the subject property <br />• EMERGENCY VEHICULAR CIRCULATION <br />o Condition Requires Additional turning radii information per Louisville Fire Protection <br />District, applicant will supply this next week <br />• LANDSCAPE AND DRAINAGE <br />0 10' drainage easement along western property line <br />0 20' drainage and utility easement along southern property line <br />o Goodhue Ditch runs along the property line, inside the 20' easement <br />o Condition <br />o Easement for access and maintenance of the drainage easement along the western <br />edge of the property. <br />o Retaining Wall Waiver Request <br />o Section 6.1.H requires articulation, offsets, and landscape pockets for walls over 50 <br />feet <br />o Public Works okay with this request <br />
The URL can be used to link to this page
Your browser does not support the video tag.