Laserfiche WebLink
Planning Commission <br />Meeting Minutes <br />November 10, 2016 <br />Page 8 of 23 <br />• A similar plan was reviewed in March 2016. Under that plan, there were 65 residential <br />units proposed. It was a PUD and GDP amendment. They were transferring the same 17 <br />units, reducing the commercial density, but proposed 31 age -restricted units. It was in <br />multi -family buildings where residential was located. The commercial uses are all along <br />So Boulder Road. In March 2016, the PC did approve that plan as proposed. <br />• In April 2016, the So Boulder Road Small Area Plan was approved. In that plan, it <br />essentially adopted a policy that restricted residential density to that for which the <br />property was already zoned. The option for the SRU for additional residential density <br />beyond what the property was presently zoned was removed. While the So Boulder <br />Road Small Area Plan is not applicable to this project because it did come in before its <br />adoption, the developer decided it would be best to remove the age -restricted units from <br />the development plan and come back with a revised plan that meets the residential <br />density allowed by the GDP. They felt they were complying with this element of the So <br />Boulder Road Small Area Plan. <br />• The current proposal is for 38 residential units and 40,000 SF of retail space. Block 12 <br />and Block 15 have been approved and are under construction. <br />• The 6 single family units proposed are on the west end of the project. There are 8 <br />townhome units in two buildings and 24 multi -family units in two buildings. All <br />commercial is still along So Boulder Road. <br />• The project is considered to be in accordance with the 2013 Comp Plan. The Comp Plan <br />identifies this area as an urban corridor with a focus on commercial, office, and <br />neighborhood retail, with higher density housing in close proximity to the roadway. <br />Additionally, the Comp Plan states that development and urban corridors must <br />demonstrate a positive fiscal return and establish residential density allowances up to 25 <br />units per acre. The fiscal impact model estimates that this project will general $963,000 <br />over a 20 year period or $48,150 annually. It does have a positive fiscal impact. <br />• The Comp Plan also includes policies related to housing, specifically to insure mixed <br />housing types and that prices meet changing economic social and multi -generational <br />needs. The project includes a mix of single family, townhomes, and multifamily. The <br />previous proposal supported by the PC with age -restricted units would have diversified <br />the housing stock. Because of the new policy in the So Boulder Road Small Area Plan, <br />those units were removed from this application to insure it meets the density cap. <br />• There are three primary access points into this project. <br />o Right -in, right -out off of So Boulder Road <br />o Blue Star Lane and Hecla Way <br />o Hecla Way to Plaza Drive to the traffic signal <br />o With this proposal and reduction in residential units, the trip generation rates <br />have dropped from what was previously approved. <br />• The City traffic engineer concurs with the findings and the traffic impact studies <br />submitted. There are no additional lanes or lights necessary to facilitate traffic generated <br />from this project. The traffic impact study found that the level of services would be <br />maintained with or without this added development project. <br />• 149 parking spaces are required for the 40,000 SF of commercial and office space. 163 <br />spaces are proposed in a surface lot and an additional 43 spaces are available on Hecla <br />Way and Blue Star Lane. <br />• All residential units will have garage parking. Any guest parking will be accommodated <br />by excess parking in the surface lots or on the roads. This application does meet all the <br />parking requirements. <br />• The commercial architecture has not changed since the plans submitted in March 2016. <br />There is a third story element added to Building 6. The commercial buildings range from <br />30' to 33'. The third story element will take this building up to 40'. The maximum height <br />on this development site is 40'. <br />