Laserfiche WebLink
03823583 <br />10/13/2020 11:55 AM <br />RF: $83.00 DF: $0.00 Page: 1 of 15 <br />Electronically recorded in Boulder County Colorado. Recorded as received. <br />CITY COUNCIL CERTIFICATE <br />APPROVED THIS fr‘DAY OF JAMAAle-Y , 20U, BY THE <br />CITY COUNCIL OF THE CITY OF LOUISVILLE, COLORADO. <br />RESOLUTION NO. 5 SERIES 2,02,C) <br />SEAL :I <br />PLANNING COMMISSION CERTIFICATE <br />RECOMMENDED APPROVAL THIS L 4.-1 DAY OFC.e-�r. , 201—L <br />BY THE PLANNING COMMISSION OF THE CITY OF LOUISVILLE, COLORADO. <br />RESOLUTION NO. (Q) SERIES 2 i.I <br />CLERK AND RECORDER CERTIFICATE <br />(COUNTY OF BOULDER <br />STATE OF COLORADO) <br />I HEREBY CERTIFY THAT THIS INSTRUMENT WAS FILED IN MY OFFICE AT <br />O'CLOCK, M., THIS DAY OF <br />20._., AND IS RECORDED IN PLAN FILE , FEE <br />PAID FILM NO. , RECEPTION <br />RECORDER DEPUTY <br />OWNERSHIP SIGNATURE BLOCK <br />BY SIGNING THIS P.U.D., THE OWNER ACKNOWLEDGES AND ACCEPTS ALL <br />THE REQUIREMENTS AND INTENT SET FORTH IN THIS P.U.D. <br />WITNESS OUR HANDS AND SEALS THIS aim DAY OF ��kebiup{ <br />CTC FCM-II, LLC. <br />NO <br />ARY <br />(OWNER) <br />t401ARIf PUBLIC <br />S1' TEOFCOLORADO <br />NCTARIY Et 9401240zOPINES 04/0212023 <br />, 2O'Q. <br />Final Planned Unit Development <br />Lot 1, The Business Center at CTC Replatj <br />New Building at 1875 Taylor Avenue <br />ZONING INFORMATION <br />ZONING: PLANNED COMMERG I AL ZONE D I STR I CT INDUSTRIAL, SUBJECT <br />TO THE BUSINESS CENTER AT CTC GDP AMENDMENT F <br />SETBACKS (PRINCIPAL BUILDINGS): SETBACKS (PARKING): <br />SOUTH - TAYLOR AVENUE: 55SOUTH - TAYLOR AVENUE: 15' <br />PROVIDED: <br />NORTH - HIGHWAY 42: <br />PROVIDED: <br />EAST - OTC BLVD <br />PROVIDED: <br />WEST - SIDE INTERIOR <br />PROVIDED: <br />I2q' <br />50' <br />150'-4" <br />35' <br />c12'-O" <br />25' <br />86'-3 <br />PROVIDED: 25' <br />NORTH - HIGHWAY 42: 25" <br />PROVIDED: 55'- I I " <br />EAST - CTC 5LVD 15' <br />PROVIDED: 24' <br />WEST - SIDE INTERIOR 10' <br />PROVIDED: I I'-6" <br />ALLOWABLE MAXIMUM BUILDING HEIGHT: 35' (CITY OF LOU 1SVILLE GDDSG) <br />PROPOSED BUILDING HEIGHT = 33'-0". AVERAGE GRADE AT CORNERS <br />OF THE BUILDING 15 ELEVATION 5334. BUILDING HEIGHT IS 3I'-6" <br />ABOVE FINISH FLOOR ELEVATION OF 5335. <br />WAIVERS: <br />SEE NOTE #8 BELOW ON USES AND REQUESTED PARKING WAIVER AND <br />NOTE #q ON CARPORT SETBACK WAIVER <br />GENERAL NOTES: <br />I. THE PROJECT IS TO BE CONSTRUCTED IN ONE PHASE. <br />2. CONSTRUCTION MATERIALS ARE AS FOLLOWS: <br />WALLS: PRE -CAST CONCRETE PANELS PAINTED AS FOLLOWS <br />COLOR B-I : SHERWIN WILLIAMS SW 7016 "MINDFUL GRAY" <br />COLOR 5-2: SHERWIN WILLIAMS SW 7018 "DOVETAIL" <br />COLOR 5-3: SHERWIN WILLIAMS SW '7048 "URBANE BRONZE" <br />COLOR A-1: SHERWIN 1ILLIAMS SW 7020 "BLACK FOX" <br />WOOD SIDING PANELS - NICHIGHA "VINTAGE WOOD - CEDAR" <br />ARCHITECTURAL METAL PANELS - NATURAL ANODIZED FINISH. <br />ROOF: TAPERED WHITE TPO ROOF (CONCEALED BY PARAPET) <br />WINDOWS: ALUMINUM STOREFRONT - NATURAL ANODIZED FINISH <br />CANOPIES: ALUMINUM/STEEL NATURAL ANODIZED OR SILVER <br />PAINTED. <br />3. THE PROJECT IS TO BE DESIGNED IN ACCORDANCE WITH THE <br />CRITERIA SET FORTH IN THE CITY OF LOUISVILLE COMMERCIAL <br />DEVELOPMENT DESIGN STANDARDS AND GUIDELINES (GDDSG). <br />4. ALL EXISTING PUBLIC AND PRIVATE SIDEWALK, CURB, GUTTER AND <br />ASPHALT ADJACENT TO THE PERIMETER OF THE SITE THAT 15 <br />CRACKED, SETTLED, OR OTHERWISE DAMAGED SHALL BE REMOVED <br />AND REPLACED BY THE CONTRACTOR AS DETERMINED NECESSARY <br />BY THE G I TY, AS PART OF THE PROJECT, AND AT THE DEVELOPERS <br />EXPENSE. <br />5. NO OFF SITE IMPROVEMENTS ARE ANTIC I PATED TO BE REQU I RED IN <br />CONJUNCTION WITH THIS PROJECT. <br />6. ANY ROOF TOP SCREENING SHALL BE SUBJECT TO THE CODS& OR <br />THE DESIGN REGULATIONS IN EFFECT AT THE TIME OF INSTALLATION. <br />'7. ANY RETAININ6 WALL MATERIAL ASSOCIATED WITH THE DETENTION <br />POND WILL MATCH THE PRIMARY BUILDING COLORS. <br />8. THE BUILDING 15 BEING DEVELOPED AS A SPECULATIVE VENTURE. <br />NO TENANTS ARE KNOWN AT THIS TIME, 50 INITIAL PARKING 15 <br />PROPOSED AT 2 SPACES PER 1000 S.F. MIN. WITH DEFERRED <br />PARKING AVAILABLE TO ACCOMMODATE VARIOUS USER TYPES. <br />ADEQUATE QUANTITIES OF PARKING IN COMPLIANCE WITH PARKING <br />STANDARDS WILL BE VERIFIED AT THE _TIME OF BUILDING PERMIT <br />REVIEW FOR TENANT FINISHES BASED ON THE SQUARE FOOTAGE OF <br />THE BUILDING DEVOTED TO INDIVIDUAL USES. NEW TENANT FINISH <br />PERMITS SHALL NOT BE ALLOWED UNLESS IN COMPL I ANCE WITH THE <br />CITY'S MINIMUM PARKING STANDARDS. <br />q. A WAIVER 15 BEING REQUESTED TO ALLOW FOR CARPORTS TO <br />OCCUR WITHIN THE BUILDING SETBACK IF NEEDED. <br />10. OVERHEAD DOORS ON THE SOUTH SIDE MAY BE CONVERTED TO <br />ALL STOREFRONT GLASS DEPENDING ON FUTURE TENANT'S NEEDS. <br />SEE PARTIAL ALTERNATE ELEVATION ON SHEET 3. <br />II. SOLAR CARPORTS ARE BEING CONSIDERED FOR SOME OF THE <br />PARKING ON THE NORTH AND WEST SIDE. SEE SHEET 3. <br />12. PROPERTY OWNER IS RESPONSIBLE FOR INSTALLATION AND <br />MAINTENANCE OF LANDSCAPING IN OUTLOT E. <br />LAND USE BREAKDOWN <br />Site Area Breakdown <br />Lot 1(Excludes Outiot E) <br />Building Coverage <br />Single Building <br />Parking & Drives <br />Sidewalks <br />Landscape <br />SF <br />83,615 27.80% <br />114,189 37.97% <br />6,636 2.21% <br />96,310 32.02% <br />Total 300,750 100.0% <br />Total Building Area: <br />Main Floor <br />Second Floor <br />Total <br />Parking <br />Initial <br />Deferred <br />Total <br />Accessible Spaces <br />Bicyle Parking <br />83,615 <br />83,615 <br />175 (2.09 spaces/1000 s.f.) <br />116 <br />291 (3.48 spaces/1000 s.f.) <br />6 Required <br />6 Provided <br />1 Space per 10 Required Auto Spaces <br />up to 20 Maximum <br />5 racks @ 4 bikes per rack = 20 provided <br />PROJECT DATA <br />i <br />OWNER: <br />CTC FCM-II, LLC <br />1112 BARBERRY COURT <br />BOULDER, COLORADO 80305 <br />303-827-0020 phone <br />ARCHITECT/PLANNER: <br />RVP ARCHITECTURE AND CONSULTING, P.G. <br />3223 ARAPAHOE AVENUE, SUITE 220 <br />BOULDER, COLORADO 80303 <br />303-443-5555 <br />CIVIL ENGINEER: <br />HURST 4 ASSOCIATES, I NC. <br />1265 PUBLIC ROAD, SUITE <br />LAFAYETTE, COLORADO 80026 <br />303-449-41105 <br />LANDSCAPE ARCHITECT: <br />TOPE LLC <br />1466 N. FRANKLIN COURT <br />LOUISVILLE, COLORADO 80021 <br />303-500-1058 <br />LIGHTING PHOTOMETRIC DESIGN: <br />THE LIGHTING AGENCY <br />2661 I7TH STREET <br />DENVER, COLORADO 80211 <br />303-455-1012 phone <br />PUD <br />DRAWING <br />INDEX <br />1 <br />COVER SHEET <br />2 <br />DEVELOPMENT PLAN <br />3 <br />SITE DETAILS <br />4 <br />ELEVATIONS <br />5 <br />UTILITY PLAN <br />6 <br />GRADING PLAN <br />7 <br />LANDSCAPE NOTES AND TABLES <br />8 <br />OVERALL LANDSCAPE PLAN <br />9 <br />PLANTING PLAN ENLARGEMENT <br />10 <br />PLANTING PLAN ENLARGEMENT <br />11 <br />PLANTING PLAN ENLARGEMENT <br />12 <br />PLANTING PLAN ENLARGEMENT <br />13 <br />LANDSCAPE DETAILS <br />14 <br />PHOTOMETRIC PLAN <br />15 <br />LIGHTING CUT SHEETS/TABLES <br />Cherry. St. <br />• <br />syeA <br />Superior <br />4 <br />N <br />c <br />Louisville 2 <br />/1 <br />VICINITY MAP <br />Lafayette <br />Na SCALE <br />®® <br />NORTH <br />LEGAL DESCRIPTION: L 0 T 1, THE BUSINESS CENTER AT .CTC. <br />REPLA T J, COUNTY OF BOULDER, STATE OF COLORADO. <br />L <br />'2V <br />U <br />ro� <br />0M <br />NM <br />�O <br />2O <br />N <br />E <br />Zo <br />t <br />2 <br />■ <br />. — <br />m <br />a) <br />z <br />u <br />J <br />J <br />CTC FCM-II, <br />r-- <br />PROJ NO: <br />DATE <br />REV: <br />18-15 <br />JULY 1, 2019 <br />AUG 28, 2019 <br />OCT. 25, 2019 <br />DEC. 23, 2019 <br />JAN. 10, 2020 <br />FEB. 7, 2020 <br />Copyright a019 - All rights <br />reserved RVP Architecture and <br />Consulting, P.C. All design <br />drawings and written material <br />herein may not be used or <br />duplicated without the written <br />consent of RVP Architecture and <br />Consulting, P.C. <br />COVER SHEET <br />1 <br />SHEET 1 OF 1 5 <br />