Laserfiche WebLink
WATFR C'Ds <br />(New request <br />2021-2026) <br />Project Name <br />Ref. Page 2021 <br />2022 <br />2023 2024 <br />Essential or Regulatory Projects <br />Water Line Replacement <br />38 <br />Water Tank interior Structure Maintenance <br />39 <br />Electrical Assessment <br />40 <br />Marshall Lake Sediment Control <br />41 <br />NCWCD-Windy Gap Firming Project <br />42 <br />HBWTP Recycle Tank Cleaning and Repair <br />43 <br />Water Rights Acquisition <br />44 <br />Process Pipe Evaluation and Repairs <br />45 <br />Replacement Projects <br />Meter replacement <br />46 <br />SBR Ditch Lining <br />47 <br />Pump Replacement/Rehab <br />48 <br />Raw Water Valve <br />49 <br />Backhoe Replacement (50%) <br />50 <br />Asphalt Patch Truck (30%) <br />51 <br />Water Break Repair Vehicle Replacement <br />52 <br />Chemical Mixing Tanks <br />53 <br />Utility Master Plan <br />54 <br />Valve Exercise Trailer (70%) <br />55 <br />Filter Media Replacement <br />56 <br />Vehicle 8t Equipment Replacement <br />57 <br />HBWTP Drying Bed <br />58 <br />WTP Instrumentation Upgrades <br />59 <br />Delayable Projects <br />Harper Pump Station Rehab 60 <br />Lateral Ditch Piping 61 <br />TOTALS <br />$460, 000 <br />$100, 000 <br />$600,000 <br />$926,000 <br />$195,000 <br />$250,000 <br />$97,750 <br />$84,000 <br />$35,000 <br />$78,750 <br />$80,400 <br />$89,250 <br />2025 <br />$391,000 $540,500 $724,500 $494,500 <br />$30,000 <br />$100, 000 <br />$926,000 <br />$926,000 <br />$926,000 <br />$926,000 $926,000 <br />$250,000 <br />$250,000 <br />$250,000 <br />$500,000 $500,000 <br />$80,000 <br />$50,000 <br />$50,000 <br />$50,000 <br />$218,500 $143,750 <br />$276,000 $17,000 <br />$32,500 <br />$125,000 <br />$54, 390 <br />$616,000 <br />$80, 000 $50,000 <br />$1,040,000 $1,040,000 <br />$221,000 <br />$260,000 <br />$95, <br />$3,120, <br />$2,996,150 $2,483,390 $2,623,250 $2,000,500 $3,231,500 $6,212, <br />