My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Utility Committee Agenda and Packet 2020 08 11
PORTAL
>
BOARDS COMMISSIONS COMMITTEES RECORDS (20.000)
>
UTILITY COMMITTEE (pka: Water Committee)
>
2020 Utility Committee Agendas and Packets
>
Utility Committee Agenda and Packet 2020 08 11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2020 11:41:45 AM
Creation date
8/13/2020 8:25:15 AM
Metadata
Fields
Template:
City Council Records
Meeting Date
8/11/2020
Doc Type
Boards Commissions Committees Records
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Project Name: Process Pipe Evaluation <br />• •I • UP <br />Submitted By: Public Works Version: 3/3/2020 <br />Program(s): <br />Sub-Program(s): Funding Source(s): Percent <br />Utilities <br />Water Water Utility Fund 100% <br />100% <br />Equipment or <br />Year 1 <br />Year 2 Year 3 Year 4 Year 5 Year 6 <br />Six -Year <br />Project Costs <br />2021 <br />2022 2023 2024 2025 2026 <br />Total <br />Land Acquisition <br />- <br />- - - - - <br />- <br />Design & Engineering <br />80,000 - - - <br />80,000 <br />Other Prof Services <br />- <br />- - - - - <br />- <br />Construction <br />- - <br />- <br />Other Equip/Project Costs <br />- <br />- - <br />- <br />Capital Equipment Purch <br />- <br />- - - <br />- <br />Contingency <br />- 50,000 50,000 50,000 - <br />150,000 <br />- <br />80,000 50,000 50,000 50,000 - <br />230,000 <br />Total Costs (Gross) <br />Grants or Other <br />Off -Setting Revenue <br />- - - - - <br />- <br />Impact to Annual <br />Maint/Operating Costs <br />- - - <br />Description & Proposed Funding: <br />Equipment/Project Description: <br />— <br />This CIP will fund the inspection and evaluation of existing internal <br />�F J process pipe infrastructure with non -destruction testing (ultrasonic, <br />f <br />radiography, or magnetic particle). Contingency amounts were added as <br />placeholders for potential repairs identified during the evaluation. <br />i <br />Project revenue or grants that will support the project and the <br />impacts to the operating budget: <br />No grants have been identified at this time. Annual maintenance is not <br />expected to change. <br />r <br />Reference to Plan being implemented (i.e., Master Plan): <br />Justification and Alignment with Program/Sub-Program Goals & Key Performance Indicators: <br />Much of the piping inside both of the Water Treatment Plants is 30+ years old. This project will evaluate the integrity and condition of <br />exposed piping and determine if replacement is needed before it fails. Pipe failure could result in the plant becoming inoperable and <br />force plant shutdown, ceasing water production <br />until repaired. Proper inspection and repair can greatly mitigate this risk. Proper <br />maintenance can reduce long term asset expenses and improve water quality. <br />Department Priority Ranking: High <br />Request Number: (Finance Use) <br />
The URL can be used to link to this page
Your browser does not support the video tag.