My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Utility Committee Agenda and Packet 2020 08 11
PORTAL
>
BOARDS COMMISSIONS COMMITTEES RECORDS (20.000)
>
UTILITY COMMITTEE (pka: Water Committee)
>
2020 Utility Committee Agendas and Packets
>
Utility Committee Agenda and Packet 2020 08 11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2020 11:41:45 AM
Creation date
8/13/2020 8:25:15 AM
Metadata
Fields
Template:
City Council Records
Meeting Date
8/11/2020
Doc Type
Boards Commissions Committees Records
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Project Name: Pump Replacement and Rehabilitation Submitted By: Public Works Version: <br />Program(s): Sub-Program(s): Funding Source(s): <br />Utilities Water Water Utility Fund <br />2/11/2020 <br />Percent <br />100% <br />Equipment or <br />Year 1 <br />Year 2 <br />Year 3 Year 4 <br />Year 5 Year 6 <br />Six -Year <br />Project Costs <br />2021 <br />2022 <br />2023 2024 <br />2025 2026 <br />Total <br />Land Acquisition <br />- <br />- <br />- - <br />- - <br />- <br />Design & Engineering <br />- <br />Other Prof Services <br />- <br />- <br />- - <br />- - <br />- <br />Construction <br />84,000 <br />276,000 <br />17,000 <br />377,000 <br />Other Equip/Project Costs <br />- <br />- <br />- - <br />- - <br />- <br />Capital Equipment Purch <br />- <br />Contingency <br />- <br />- <br />- - <br />- - <br />- <br />84,000 <br />276,000 <br />17,000 - <br />- - <br />377,000 <br />Total Costs (Gross) <br />Grants or Other <br />Off -Setting Revenue <br />- <br />Impact to Annual <br />Maint/Operating Costs <br />- <br />- - <br />- <br />Description & Proposed Funding: <br />Equipment/Project Description: <br />This project is for the replacement or rehabilitation of various pumps <br />2021-SCWTP Lower Pond Pump <br />2022-HBWTP High Zone Pumps <br />2023-HBWTP Recycle Pump <br />Project revenue or grants that will support the project and the <br />impacts to the operating budget: <br />No grants have been identified at this time. Annual maintenance is not <br />expected to change. <br />Reference to Plan being implemented (i.e., Master Plan): <br />E Justification and Alignment with Program/Sub-Program Goals & Key Performance Indicators: <br />This project is a critical component of the City's treatment process and will ensure a reliable water supply. This CIP provides the funds to <br />rebuild or replace the identified pumps. Each pump will be evaluated by a 3rd party vendor to determine the feasibility of rebuilding vs <br />replacement. These pumps are up to 25 years old and carry a significant lead-time if failure occurred. Additionally, in the event of failure <br />staff would not be able to pump water from the recycling tank to the reservoir which would cause flooding onsite and potential fines from <br />the state. Failure of high zone pumps would prevent staff from sending water to the 2MG tank which stores 1/3 of City's drinking water. <br />Lastly, failure of the recycle pump would result in the inability to pump water out of the recycle tank and a 3rd party vendor would be <br />needed to haul away the contents. The high zone pumps are the only system with redundancy as there are three pumps and we need two <br />to keep up with peak demands. <br />E Department Priority Ranking: High Request Number: flponce Use) <br />
The URL can be used to link to this page
Your browser does not support the video tag.