Laserfiche WebLink
Modeled Tap Fc%Anir <br />Uti lity <br />Water <br />Wastewater <br />2020 <br />2021 <br />2022 <br />2023 <br />2024 <br />2025 <br />2026 <br />Total <br />$2.85M <br />$2.5M <br />$3M <br />$261 k <br />$115k <br />$61 k <br />$61 k <br />$8.8M <br />$248k <br />$423k <br />$320k <br />$26k <br />$17k <br />$9k <br />$9k <br />$1M <br />30 <br />