Laserfiche WebLink
Budgeted Multi -Year Water CIPs <br />Project Name <br />Essential or Regulatory Projects <br />Water Tank interior Structure Maintenance <br />SWSP Transmission Capacity <br />Marshall Lake Sediment Control <br />Replacement Projects <br />Filter Media Replacement <br />Fluoride Equipment Replacement <br />Raw Water Quality Study <br />Delayable Projects <br />Lateral Ditch Piping <br />Lower Recycle Pond SCWTP <br />TOTAL FOR ALL CIPS <br />2020 2021 <br />$389,490 <br />$2,714,360 <br />$600,000 <br />$ 326,950 <br />$175, 000 <br />$705, 000 <br />2022 2023 <br />$616,000 <br />2024 2026 <br />$3,120,000 <br />$10,176,060 $2,996,150 $2,483,390 $2,623,250 $2,000,500 $6,212,500 <br />33 <br />