Laserfiche WebLink
First Amendment to 1875 Taylor PUD <br />Lot 1, The Business Center at CTC Replat <br />New Building at 1875 Taylor Avenue <br />ZONING INFORMATION <br />ZONING: PLANNED COMMERCIAL ZONE DISTRICT INDUSTRIAL, SUBJECT <br />TO THE BUSINESS CENTER AT CTC GDP AMENDMENT F <br />SETBAGKS (I RINC I PAL BUILDINGS) : <br />SOUTH - TAYLOR AVENUE: 35' <br />PROVIDED: <br />NORTH - HIGHWAY 42: <br />PROVIDED: <br />EAST - GTG BLVD <br />PROVIDED: <br />WEST - SIDE INTERIOR <br />PROVIDED: <br />1241' <br />50' <br />130'-4" <br />35' <br />Q2'-0" <br />25' <br />8.6'-3 <br />SETBACKS (PARKIN): <br />SOUTH - TAYLOR AVENUE: 15' <br />PROVIDED: 25' <br />NORTH - HIGHWAY 42: 25" <br />PROVIDED: 55'-11 " <br />EAST - OTC BLVD 15' <br />PROVIDED: 24' <br />WEST - SIDE INTERIOR 10' <br />PROVIDED: 111-6" <br />ALLOWABLE MAXIMUM BUILDING HEIGHT: 35' (CITY OF LOUISVILLE CDDS6) <br />PROPOSED BUILDING HEIGHT = 35'-0". AVERAGE GRADE 10' FROM <br />THE HIGHEST AND LOWEST CORNERS OF THE BUILDING 15 ELEVATION <br />5333.15. THE TALLEST PORTIONS OF BUILDING (VARIOUS LOCATIONS <br />ON THE NORTH, EAST AND SOUTH SIDES) 15 34'-1" ABOVE FINISH FLOOR <br />ELEVATION OF 5335.0. <br />NOTE: <br />I. THE PURPOSE OF THIS PUD AMENDMENT I5 TO INCREASE THE <br />MAXIMUM HEIGHT OF THE BUILDINe FROM 53'-0" TO 35'-O". NO <br />OTHER CHANGES ARE PROPOSED ON THIS PUD AMENDMENT. <br />DIRECTOR OF PLANNING AND BUILDING SAFETY CERTIFICATE <br />APPROVED THIS Z2 " DAY OF Pr , 20249, BY THE <br />DIRECTOR OF PLANNING AND BUILDING SAFETY OF THE CITY OF <br />LOUISVILLE, COLORADO <br />OF P NING AND <br />BY c. k,.- c-�►-✓© <br />CLERK AND RECORDER CERTIFICATE <br />(COUNTY OF BOULDER <br />STATE OF COLORADO) <br />I HEREBY CERTIFY THAT THIS INSTRUMENT WAS FILED IN MY OFFICE AT <br />O'CLOCK, . M., THIS DAY OF <br />20_ , AND IS RECORDED IN PLAN FILE , FEE <br />PAID FILM NO. , RECEPTION <br />RECORDER <br />DEPUTY <br />OWNERSHIP SIGNATURE BLOCK <br />BY SIGNING THIS P.U.D., THE OWNER ACKNOWLEDGES AND ACCEPTS ALL <br />THE REQUIREMENTS AND INTENT SET FORTH IN THIS P.U.D. <br />WITNESS OUR HANDS AND SEALS THIS 21 DAY OF � , 20/10 <br />cbwiaco <br />BRANDY- <br />AVER-.= HOARY New <br />sTATEOCOLORADO <br />NOTARY ID.20204006056 <br />lM1' OQI SSIO RMIRES 02/12/2024 <br />LAND USE BREAKDOWN <br />Site Area Breakdown <br />Lot 1 (Excludes Outlot E) <br />Building Coverage <br />Single Building <br />Parking & Drives <br />Sidewalks <br />Landscape <br />SF <br />83,615 <br />114,189 <br />6,636 <br />96,310 <br />27.80% <br />37.97% <br />2.21% <br />32.02% <br />Total 300,750 100.0% <br />Total Building Area: <br />Main Floor <br />Second Floor <br />Total <br />Parking <br />Initial <br />Deferred <br />Total <br />Accessible Spaces <br />83,615 <br />83,615 <br />175 (2.09 spaces/1000 s.f.) <br />116 <br />291 (3.48 spaces/1000 s.f.) <br />6 Required <br />6 Provided <br />Bicyle Parking 1 Space per 10 Required Auto Spaces <br />up to 20 Maximum <br />5 racks @ 4 bikes per rack = 20 provided <br />PROJECT DATA <br />OWNER: <br />CTC FCM-II, LLC <br />1112 BARBERRY COURT <br />BOULDER, COLORADO 80305 <br />303-827-0020 phone <br />ARCHITECT/PLANNER: <br />RVP ARCHITECTURE AND CONSULTING, P.C. <br />842 TRAIL RIDGE DRIVE <br />LOUISVILLE, COLORADO 80027 <br />303-443-5355 <br />CIVIL ENGINEER: <br />HURST & ASSOCIATES, INC. <br />1265 PUBLIC ROAD, SUITE B <br />LAFAYETTE, COLORADO 80026 <br />303-449-9105 <br />LANDSCAPE ARCHITECT: <br />TOPE LLC <br />1466 N. FRANKLIN COURT <br />LOUISVILLE, COLORADO 80027 <br />303-500-1058 <br />LIGHTING PHOTOMETRIC DESIGN: <br />THE LIGHTING AGENCY <br />2661 17TH STREET <br />DENVER, COLORADO 80211 <br />303-455-1012 phone <br />PUD <br />DRAWING <br />INDEX <br />1 <br />COVER SHEET <br />2 <br />ELEVATIONS <br />03830213 11/04/2020 03:13 PM <br />RF: $23.00 DF: $0.00 Page: 1 of 2 <br />Electronically recorded in Boulder County Colorado. Recorded as received. <br />South Boulder <br />Cherry St. <br />Avist <br />Hospital <br />Campus <br />Superior <br />c <br />LOUnSVlI le 2 <br />GOO, <br />DIIIon Rd. <br />Monarch HS <br />Health Park Dr. <br />Conoco <br />Ph i l I ips <br />Lafayette <br />VICINITY MAP <br />No SCALE <br />NORTH <br />LEGAL DESCRIPTION: L 0 T 1, THE BUSINESS CENTER AT CTC. <br />REPLA T J, COUNTY OF BOULDER, STATE OF COLORADO. <br />• <br />0 <br />ouse <br />V <br />L <br />O Co <br />co <br />2 <br />m a <br />a <br />25 <br />ara <br />■ <br />v <br />■ <br />CTC FCM-I <br />1 <br />a) <br />CL <br />C <br />V <br />N <br />C <br />vn <br />CO <br />t <br />11 <br />IMJ <br />im <br />11110 <br />0 <br />J <br />PROJ NO: 18-15 <br />DATE SEPT. 21, 2020 <br />REV: <br />Copyright ©2020 - All rights <br />reserved RVP Architecture and <br />Consulting, P.C. All design <br />drawings and written material <br />herein may not be used or <br />duplicated without the written <br />consent of RVP Architecture and <br />Consulting, P.C. <br />COVER SHEET <br />1 <br />BUILDI <br />NG SAFETY <br />SHEET 1 OF 1 <br />