Laserfiche WebLink
FABRICATOR PERFORMANCE <br />& MATERIAL REQUIREMENTS <br />This document has been assembled by ArtHouse Design with the expectation that the <br />fabricator will meet or exceed the following quality and performance requirements. <br />The acceptance of these drawings by the Fabricator constitutes agreement to <br />comply with the following conditions. The Owner will hold the Fabricator to these <br />requirements as part of their contract obligations. <br />1.GENERAL <br />A. Proprietary Information Non -Disclosure Agreement: <br />All ideas, designs, arrangements and plans indicated or presented by <br />these drawings are the property of the Owner, and were created for <br />use in connection with the specified project. The information in this <br />document is confidential and shall not be disseminated to anyone <br />other than ArtHouse Design, the Owner, or the Fabricator's personnel <br />necessary to execute the contract, without the written permission of <br />ArtHouse Design and the Owner. <br />In addition, the Fabricator must request and receive written approvals <br />from both the Owner and ArtHouse Design to use images of any <br />completed element. The Fabricator is responsible for ensuring that <br />credit indicating ArtHouse Design as the Designer will accompany <br />all images and articles related to the project. The Owner may have <br />additional requirements or restrictions for which the Fabricator is also <br />responsible. <br />B. Design Intent Drawings <br />The "design intent" drawings contained in this document are for the <br />sole purpose of expressing visual design intent and are not intended <br />for construction purposes. All aspects of fabrication, installation, and <br />any resulting working drawings, shop drawings, submittals and contract <br />documents are the responsibility of the Fabricator. <br />Within the design intent drawings: <br />All written dimensions take precedence over dimensions otherwise <br />implied by drawing scale, figures, etc. <br />Large scale details take precedence over the smaller scale drawings. <br />Specific recommendations for materials, colors, and content take <br />precedence over representations shown in drawings. <br />2. PRE -FABRICATION REQUIREMENTS <br />A. Proposal <br />Copies of all pricing and bid information shall be sent to the Owner <br />and ArtHouse Design. The Fabricator shall base their proposal on <br />the performance of all items of service including labor, materials, <br />equipment, and resources required to complete fabrication and <br />installation of the specified work. Full compliance with the these <br />Fabricator Performance and Material Requirements will be required. <br />The Fabricator is encouraged to make recommendations for specific <br />changes if they will improve the quality or cost-effectiveness of <br />fabrication while preserving ArtHouse Design's visual design intent. <br />However, any such recommendations must be approved in writing by <br />the Owner and ArtHouse Design at the time of bid. Should the Fabricator <br />be contracted based on a proposal that assumes substitutions that <br />have not been properly approved, the Fabricator shall be responsible <br />for providing all elements as originally indicated at their own expense <br />The Fabricator shall have a licensed structural, electrical and civil <br />engineer as part of their team, or as a sub -consultant. <br />B. Shop Drawings <br />The Fabricator shall submit detailed shop drawings of all fabricated <br />items to the Owner and ArtHouse Design. This submission shall consist <br />of three hard copy sets of detailed drawings that indicate all materials, <br />finishes, construction details, lighting requirements, installation details, <br />and artwork, including locations of all material seams. Drawings shall <br />include elevations, plans, sections, and notes as required to clearly <br />convey fabrication intent. <br />The shop drawings will be reviewed for aesthetic appearance and <br />compatibility with the overall visual design intent. Upon review, the <br />Fabricator shall make all requested revisions and resubmit as required. <br />A complete set of approved shop drawings (noted "No Exceptions <br />Taken" or "Exceptions as Noted") must be received from both the Owner <br />and ArtHouse Design before production may begin. <br />C. Submittals/Samples <br />The Fabricator is responsible for providing submittals to the Owner <br />and ArtHouse Design as required per "Quantities & Submittals' section <br />of this document. ArtHouse Design will review samples for aesthetic <br />appearance and compatibility with adjacent conditions. Compliance <br />with other requirements is the exclusive responsibility of the Fabricator. <br />All materials, finishes, and content are subject to revision until final <br />submittals have been approved. A complete set of approved submittals <br />must be received from both the Owner and ArtHouse Design before <br />fabrication may begin. Required submittals must be issued in an <br />adequate time frame to allow review, adjustments, and approval without <br />delaying the project schedule. <br />If requested, samples shall include the following <br />a. Paint and Finishes: samples of each specified project paint color and <br />finish, texture as required, and applied to final specified material as <br />indicated. <br />b. Vinyl Sheeting: samples of each project vinyl color. Machine cutout <br />letters and vinyl letters. <br />c. Digital Prints: Full color sections of each digital print at final size <br />and resolution, printed on the final specified material. Full color <br />samples of each digital print in its entirety at reduced size and <br />scaled to fit printed on final specified material. <br />d. Copy and Text Layouts: Half size black and white printed samples <br />of each message layout including copy, symbols and sign panel <br />boundary; layouts shall be labeled with sign type, location and side <br />as required. Layouts will use exact project fonts and symbols and <br />show exact spacing and positioning of all elements required on sign. <br />Fonts and symbols will be solid black; outlines will not be accepted. <br />e. Fonts and Symbols: Each project font consisting of a full alpha- <br />numeric character set (upper and lower case) printed in black and <br />white. <br />3. FABRICATION & INSTALLATION REQUIREMENTS <br />A. Permitting & Regulation Compliance <br />The Fabricator is responsible for securing and paying for all permits, <br />insurances, inspections, and tests required by governmental agencies. <br />The Fabricator is also responsible for verifying and ensuring compliance <br />with all current IBC, ADA, OSHA, environmental regulations, and all other <br />applicable governing code requirements. All required resolutions or <br />revisions to construction details must be approved by the Owner and <br />ArtHouse Design prior to production. <br />It is the Fabricator's responsibility to comply with all applicable <br />Municipal, Building and Electrical Codes of governmental agencies <br />having jurisdiction. <br />B. Structural Requirements <br />The Fabricator shall follow ArtHouse Design' drawings for exterior visual <br />appearance, but designs of internal structure, engineered connections, <br />mounting assemblies, and foundations are by the Fabricator and their <br />responsibility. Structural design shall utilize self -supportive framing and <br />prevent irregularities in exposed surfaces. <br />The Fabricator shall provide the Owner and/or the General Contractor <br />(GC) with a list of support and/or blocking requirements, and <br />approximate weights for each element as required no later than <br />twenty-one days after final shop drawing approval. <br />The Fabricator shall provide the Owner and/or the GC with <br />calculations for all structural members and foundations sealed by <br />certified engineers registered in the state of installation, prior to <br />fabrication. <br />C. Electrical Requirements <br />Design of all electrical components is by the Fabricator. All transformers <br />and electrical hardware shall be concealed (i.e. non -audible and non - <br />visible to pedestrian and vehicular traffic). The Fabricator shall ensure <br />all electrical components are easily accessible for maintenance and <br />servicing. <br />All necessary point -of -connection coordination is the responsibility <br />of the Fabricator. All connections must be in compliance with the <br />requirements of the NEC and all other applicable governing code <br />requirements. All necessary electrical components and assemblies are <br />to be Underwriters Laboratories (UL) listed, or approved by a nationally <br />recognized testing lab; and meet or exceed the standards set by UUs <br />most current Standards for Sign Safety. Illuminated signs shall bear the <br />UL inside the sign cabinet. <br />All electrical components shall be warranted against failure for at <br />least ninety days. Within the warranty period, defective electrical <br />components are to be replaced by the Fabricator within forty-eight <br />hours of notice by the Owner and/or the GC. Should the Fabricator fail <br />to replace defective components within the specified time, these items <br />may be replaced by others at the Fabricator's expense. <br />Deliverables: <br />The Fabricator shall provide the Owner and/or the GC with a list of <br />electrical requirements for each element no later than twenty-one <br />days after final shop drawing approval. <br />SIGNAGE & WAYFINDING <br />CITY OF LOUISVILLE, CO <br />GENERAL NOTES <br />SUBMITTALS REQUIRED AS PER THE QUANTITIES & SUBMITTALS <br />SECTION OF THIS DOCUMENT. <br />THESE DRAWINGS EXPRESS VISUAL DESIGN INTENT ONLY. FINAL <br />ENGINEERING, MATERIALS, AND FABRICATION SHALL REMAIN THE <br />RESPONSIBILITY OF THE FABRICATOR. <br />ALL CONTENT OF THIS DOCUMENT IS SUBJECT TO THE DESIGN INTENT <br />REQUIREMENTS OUTLINED ELSEWHERE IN THE DOCUMENT. REFER <br />TO THE FABRICATOR PERFORMANCE & MATERIALS REQUIREMENTS, <br />QUANTITIES & SUBMITTALS AND MATERIALS & FINISHES SECTIONS OF <br />THIS DOCUMENT FOR FURTHER DETAILS. <br />ALL SITE MEASUREMENTS ARE APPROXIMATE. FABRICATOR TO FIELD <br />VERIFY TO DETERMINE EXACT DIMENSIONS & CONDITIONS. <br />ON THIS PAGE: <br />FABRICATOR PERFORMANCE & MATERIAL <br />REQUIREMENTS <br />Package Issue Date Sheet Revision Date <br />1.2017 <br />a ARTHOUSE DESIGN <br />2373 CENTRAL PARK BLVD. SUITE 204 1 DENVER,C080238 <br />303.892.9816 1 ARTHOUSEDENVER.COM <br />Agenda Packet P. 12 <br />in <br />