My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Planning Commission Agenda and Packet 2013 06 13
PORTAL
>
BOARDS COMMISSIONS COMMITTEES RECORDS (20.000)
>
PLANNING COMMISSION
>
2000-2019 Planning Commission
>
2013 Planning Commission Agendas Packets Minutes
>
Planning Commission Agenda and Packet 2013 06 13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 9:30:12 AM
Creation date
11/12/2020 5:28:43 PM
Metadata
Fields
Template:
City Council Records
Doc Type
Boards Commissions Committees Records
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
5. Landscape plan <br />Included in package submittal <br />6. Architectural elevations <br />Included in package submittal <br />7. Photometric site lighting plan and fixture cut sheets <br />Included in package submittal <br />8. Floor plan delineating tenant space <br />Included in package submittal- of retail/commercial uses only <br />J. (3) Copies of required reports <br />Per our phone conversation, no fiscal or economic analysis reports are required, as <br />those were submitted and approved under the Preliminary PUD process. For traffic <br />report, Fox -Tuttle has submitted a revised Traffic Impact Study and supplemental letter <br />stating that they will work with the City of Louisville to study the options for re -signaling <br />the intersection of South Boulder Road and Centennial Drive. <br />A Final Drainage Report and a Final Grading Report have been included in this package <br />submittal. <br />K. Certified real estate appraisal <br />Deemed unnecessary for submittal per Troy Russ <br />L. Sign criteria and details <br />We have included a sheet in the drawing package which illustrates our request for an <br />exception to the city of Louisville signage code, asking for an increase in signage for the <br />Alfalfa's store. <br />M. Materials and color sample board <br />Included in package submittal <br />N. Written response to SRU criteria <br />Per our phone conversation, this item has been previously satisfied under our <br />Preliminary PUD process. <br />Q. <br />Any other documents <br />R. CD of all submitted documents <br />Plan drawings only submitted and copied onto a CD. <br />Other Final PUD requirements <br />■ Development Schedule and timing for construction <br />As stated in the preliminary PUD process, it is our intent to move quickly and efficiently through <br />the Final PUD process. We anticipate the following milestone items and associated dates for <br />completion: <br />Application deemed complete <br />Demolition of existing conditions <br />Initial site work <br />May 31, 2013 <br />June, 2013 <br />July, 2013 <br />1730 Blake Street, Suite 435 • Denver, Colorado 80202 • TEL: (303) 297-3334 • FAX: (303) 292-2601 <br />
The URL can be used to link to this page
Your browser does not support the video tag.