Laserfiche WebLink
Planning Commission <br />Meeting Minutes <br />July 11, 2013 <br />Page 6 of 10 <br />Russ provided an overview of a “Woonerf” and how this applicant has adapted the <br />concept to this project. <br />Lipton noted the four (4) letters of communications received at the meeting. <br />Pritchard moved and Moline seconded a motion to enter the four letters into the <br />record. Motion passed by voice vote. <br />Applicant Presentation: <br />Justin McClure, 950 Spruce Street, DELO and RMCS. He stated the project has <br />been in the process since 2010. He continued by answering some of the questions <br />raised during the staff presentation. <br />12,000 SF of retail is planned for the South Street area which is also referred <br />to as the Gateway Plaza. <br />The Fiscal / Economic Analysis will be available as requested with the final <br />review documents. <br />Confirmed the 20’ lot width follows the same theory as the Steel Ranch South <br />project. <br />The Lafayette Street ROW vacation will have no buildings setting in the <br />vacated area. As stated by staff there is 60” storm sewer and the easement <br />will allow access to the line if and when repairs are needed. <br />The area will be developed as one phase. <br />McClure reviewed the process of assembling the property from the following property <br />owners: Aggregate Property, PDI Property and Baker Property. He used a slide to <br />illustrate the location of each property. <br />McClure used slides to illustrate and discuss the following: <br />Original site plan for the project <br />Revised site plan based on City’s input. <br />Conceptual ideas for the project: residential transitional areas, residential only <br />and commercial area. <br />Commission Questions of Applicant: <br />Note:The questions/comments/concerns were addressed during the applicant <br />presentation and are inserted within this section of the minutes. <br />Moline asked about the addition of more retail long Cannon in Development Area #1, <br />as well as Development Area #3. <br />McClure stated the planned retail in Development Area #1 is established for specific <br />ground floor units. The retail in Area #3 might be able to expand on the east side of <br />the street. <br />Moline inquired if they, as the developer, could encourage the additional retail. <br />McClure stated the 12,000 SF along South Street, sets the ground work for additional <br />retail in other locations. <br />Moline discussed a train noise concern and asked how the DELO project will address <br />the train noise. <br />McClure stated notes have been included on the PUD to address the architecture <br />necessities to dampen the noise.