My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Revitalization Commission Agenda and Packet 2021 01 13
PORTAL
>
BOARDS COMMISSIONS COMMITTEES RECORDS (20.000)
>
REVITALIZATION COMMISSION
>
2021 Revitalization Commission Agendas and Packets
>
Revitalization Commission Agenda and Packet 2021 01 13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2021 10:17:36 AM
Creation date
1/11/2021 9:05:28 AM
Metadata
Fields
Template:
City Council Records
Meeting Date
1/13/2021
Doc Type
Boards Commissions Committees Records
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ITEMIZED CONSTRUCTION ESTIMATE - 511 E. SOUTH BOULDER RD. <br />CONSTRUCTION COST ESTIMATE <br />32 16 00 - Curbs, Gutters, Sidewalks, and Driveways <br />City sidewalk and ROW requirements, ROW landscaping & trees <br />32 16 00 - Curbs, Gutters, Sidewalks, and Driveways = $44,500.00 <br />Contractor Overhead = $8,167 <br />Total estimated Construction Costs = $45,316 <br />CONSTRUCTION COST ESTIMATE OF WATERMAIN <br />33 10 00 - Subcontractor <br />Allowance Roughly 175 LF City required Domestic water main to be replaced and <br />relocated. = $32,375.00 <br />32 14 23 - Asphalt Unit Paving for watermain replacement = $4,800.00 <br />Total estimated construction cost = $37,175 <br />SOFT COST ESTIMATE <br />Professional design and engineering fees = $13,000 <br />CITY FEE ESTIMATE <br />Boulder County Tax 1% = $817 (applied to construction values) <br />City of Louisville Tax 3% = $2,450 (applied to construction values) <br />Site Improvement fees = $2,500 <br />Total Soft Costs = $18,767 <br />XCEL COST ESTIMATE <br />34 4100 — Subcontractor Xcel <br />Allowance for (1) new street light on South Boulder Road per request of the city <br />34 4100 - Roadway Signaling and Control Equipment = $10,500.00 <br />CONTINGENCY = $10,000 <br />TOTAL ESTIMATED COSTS = $134,758 <br />Agenda Packet P. 34 <br />
The URL can be used to link to this page
Your browser does not support the video tag.