My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOA Variance Case 1975-18_302 Peerless
PORTAL
>
BOARDS COMMISSIONS COMMITTEES RECORDS (20.000)
>
BOARD OF ADJUSTMENT
>
1974-1998 Board of Adjustment Agendas and Packets
>
1975 Board of Adjustment Agendas and Packets
>
1975 BOA Case Files
>
BOA Variance Case 1975-18_302 Peerless
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2023 12:12:55 PM
Creation date
1/19/2021 1:16:40 PM
Metadata
Fields
Template:
CITYWIDE
Also Known As (aka)
Peerless 302_BOA Case 1975-18
Doc Type
Variance
Subdivision Name
Louisville North Filing 1
Property Address Number
302
Property Address Street Name
Peerless
Record Series Code
65.060
Record Series Name
Variance and Exemption Case Files
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• <br />BOARD t' : D JUS:,,,;_,., T <br />Notice of ra__..--._.o. <br />Date p:;ay- 28, 1975 <br />Caso No, 18 <br />Petition tion of 1st Savings Inv t:ient Corp. ?ay Shelton, Co Ventur ter, 1766 Garfield Ave., <br />Louisville, CO <br />Premises affects 302 ?e<rless St. Lot 70, Louisville North, Louisville, Colorado <br />Referring to the above pati t.ion for a variation tion from the requirements of the <br />Section 2-102 (B) Yard & Bulk -Requirements Zoning <br />ordinance; <br />sa as to permit The reduction of a required front yard from 25 feet to 20 feet <br />• (18 feet at overhang); and the reduction of a required rear yard from 25 feet to <br />22 feet 6 inches. <br />After a public hearing the Board of Adjustment voted to vary the <br />Zoning 2-102 (B) <br />ordinance and hereby authorize the Building Inspector <br />0 <br />to issuo permits for the above., based o:. the .following conditions: <br />All permits necessary for the prosecution of the work shell be obtained <br />within 2 months, nnd the work shall be completed within 8 months <br />from the data: of this notice. <br />Signed: <br />✓�,l/ n:� �ii 6l,---' <br />Board of Adjustment <br />
The URL can be used to link to this page
Your browser does not support the video tag.