Laserfiche WebLink
Ordinance No. XXX, Series 2020 <br />Page 7 of 15 <br /> <br />2. Timing of payment. A developer or builder shall pay the fee in <br />lieu for each market-rate unit as a prerequisite for receiving the <br />building permit for that unit. The fee paid shall be the fee in effect <br />at the time of the submittal of a complete building permit <br />application for the development, whichever is later. <br /> <br />C. Off-site location. A developer or builder may seek to provide <br />affordable units within the City in a different location than the development of the <br />market-rate units. <br /> <br />1. Quantity required. The developer or builder shall provide no less <br />quantity of affordable housing than would have been required on- <br />site. <br /> <br />2. Location restrictions. The affordable units may not be located in <br />a low to moderate income area as designated by the U.S. <br />Department of Housing and Urban Development, unless an <br />exception is granted by the City Council pursuant to subsection H <br />of this Section. <br /> <br />3. Existing housing. Existing homes may be acquired and deed <br />restricted as affordable if they are in good repair in the <br />determination of the City Manager based on an inspection paid for <br />by the developer but commissioned by the City, carry a warranty <br />of sufficient scope and duration to protect the resident from <br />significant preexisting deficiencies, and are not already burdened <br />by restrictions requiring them to be kept affordable or restrictions <br />similar in effect. <br /> <br />4. Timing of off-site construction. No final plat or site plan shall be <br />executed for the location of the market-rate units until a final plat <br />sufficient to facilitate the development of the affordable units, and <br /> final PUD if necessary, have been recorded. Phasing and security <br />shall be governed in the same manner as on-site locations as <br />described in subsection A.2 of this Section. The affordable housing <br />agreement shall run with the land and shall be recorded against the <br />off-site location. <br /> <br />5. Approval of the use of this option does not guarantee approval of <br />any land use application or building permit for the off-site <br />location. The developer risks forfeiture of security if unable to <br />build the off-site units as proposed. <br />