Laserfiche WebLink
<br />RSMeans QuickCost Estimator <br />Project Title: Cottonwood <br /> <br />Model: <br /> <br />Apartment, 1-3 Story <br /> <br />Construction: <br />Location: <br />Stories: <br /> <br />Face Brick with Concrete Block Back-up / Wood Joists <br />DENVER, CO <br /> <br />3 <br />Costs are derived from a building model with <br />basic components. Scope differences and <br />market conditions can cause costs to vary <br />significantly, <br /> <br />Story Height (I.f.): <br />Floor Area (s.f.): <br />Data Release: <br />Wage Rate: <br />Basement: <br /> <br /> <br />10 <br />28,974 <br />2008 <br /> <br />Union <br />Not included <br /> <br /> <br />$2,625,500 <br /> <br />High <br />$3,281,875 <br /> <br />Cost Ranges <br />Total: <br />Contractor's Overhead <br />& Profit: <br />Architectural Fees: <br />Total Building Cost: <br /> <br />Low <br /> <br />Med <br /> <br />$590,738 <br />$179,434 <br />$3,133,121 <br /> <br />$656,375 <br />$199,371 <br />$3,481,246 <br /> <br />$820,469 <br />$249,213 <br />$4,351,557 <br /> <br />Select from more than 50 building types in 930 locations throughout the U.S, and Canada. The RSMeans <br />Quick Cost Estimator enables you to quickly calculate an estimated value of total project cost localized to <br />your selected area. The calculations include add-on costs itemizing low, medium & high estimates for <br />Architectural Fees & Contractor's Overhead & Profit. <br /> <br />10 <br />